NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
13 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗Invoice from Weinstein & Holtman to DEP regarding environmental hazard assessments and cleanup activities at 29 Park Row.
NYC-WTC_000120172–000120222Folder label: “29 PARK ROW Block: 90 Lot: 10 BIN: 1001251 7 Theater Alley”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Time & Materials Contract/Work Authorization Page -2-
START & COMPLETION DATES
• Appr meAe Work Commencement Date: 9/15/c'! • Approximate Work Completion Date:
NOTES
• During the course of performance of the work, MAXONS may add additional labor and/or material classifications to the schedule above at rates to be determined by MAXONS. The Compensation paid MAXONS for any materials utilized by MAXONS in performance of the work which are not listed in RATE SCHEDULE above shall be equal to MAXONS' cost for such services plus twenty-five percent (25%) MAXONS' mark-up on such costs. • For those items of equipment for which rental is expressed as a daily rate, the daily rental rate shall apply to each 24-hour period during which the equipment is in possession of MAXONS' personnel performing work, regardless of the number of shifts on which such equipment is utilized during such 24-hour period. The minimum rental period for daily rental equipment is one (1) day. • MAXONS shall be compensated for costs incurred for the transportation of equipment and materials to the site of the work and for the transportation back of equipment and any remaining supplies and materials, upon completion of the work, on the basis of MAXONS' cost for such transportation plus twenty-five percent (25%), MAXONS mark-up thereon. • Any alteration or deviation from the above specifications will be binding only when executed in writing and signed by a representative or project manager of MAXONS. • All agreements are contingent upon strikes, accidents or delays beyond our control. • Contractor will furnish Certificate of Liability Insurance and Certificate of Worker's Compensation Insurance prior to beginning the work on the contract • Contractor will procure all permits required by law • Contractor and/or its subcontractor may have claim against the owner, which may be enforced under New York Lien Law • Contractor is legally required to deposit all payments received prior to completion and that, instead of making these deposits, the contractor may post a bond or contract the indemnity with the owner guaranteeing the return of proper payment under the contract • Any controversy or claim arising out of or relating to the work performed by Maxons shall be settled by arbitration in the City of New York under the Rules then obtaining of the American Arbitration Association. Maxons shall have all rights to provisional remedies, which it would have at law or equity notwithstanding this agreement to arbitrate. • In the event it becomes necessary to place this contract for collection, the undersigned accepting this contract agrees to pay all costs of collection including reasonable attorney fees and court costs.
MAXONS RESTORATIONS, INC.
By: G 9 tl'4Ss' cense #1024157)
ACCEPTANCE OF CONTRACT The above specifications and conditions,4re satisfactory and are hereby accepted. MAXONS RESTORATIONS, INC. is authorized to do work as specified. Payme is wil eb ined above. ' Er
Accepted by Buyer: ` Date: i d Notice: You, the buyer, may cancel this transaction at any time prior to midnight of the third business day after the date of this transaction
NYC-WTC 000120184
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000094912
Invoice detailing billing for bulk and air sample analysis results including PLM, PCM, and TEM testing at 44 Wall Street.
13 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000101848
Invoice submitted by a contractor to the Department of Environmental Protection for services rendered.
5 shared non-person entities · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102902
Documentation tracking the collection and transport of lead wipe samples from unit ventilators at a World Trade Center site location.
6 shared non-person entities · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000122946
Application form from Benjamin Kurzban & Son Control Inc. to the DEP regarding contract REM-ROF2 at 182 Broadway.
7 shared non-person entities · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000099966
Invoice issued by a contractor to the Department of Environmental Protection for exterior cleanup work at 101 Maiden Lane.
6 shared non-person entities · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000122659
Invoice for roof asbestos abatement work completed at 176 Broadway covering over 77,000 square feet.
8 shared non-person entities · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000132877
Consulting and testing services report on asbestos air quality monitoring at various floors of 115 Broadway in September 2001.
11 shared non-person entities · similarity 0.960
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000105047
Summary sheet documenting bulk and air sample counts for a site at 114 Greenwich Street within the World Trade Center cleanup program.
9 shared non-person entities · similarity 0.960
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000122889
Billing document from Fiber Control Inc. for environmental protection services performed at multiple job sites.
5 shared non-person entities · 1 shared topics · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000093400
A license agreement document regarding exterior cleaning services for the property at 65 Liberty Street.
10 shared non-person entities · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000123194
Invoice for roof asbestos abatement work completed at 198 Broadway covering nearly 25,000 square feet.
6 shared non-person entities · 1 shared topics · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000097440
Building owner submits exterior and interior cleaning bills and environmental assessment report for 9-15 [name].
7 shared non-person entities · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000108377
Letter from Mott & Prince Management regarding maintenance and re-occupancy issues at several buildings after the WTC collapse.
Similarity score 0.989 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000094272
Emergency work authorization form authorizing MAXONS Restorations to perform restoration work at the specified site.
Similarity score 0.987 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000108368
Letter from Mott & Prince Management responding to DEP inquiries about maintenance and re-occupancy at several buildings.
Similarity score 0.986 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000106170
Time and materials emergency contractor form authorizing work scope for repairs or cleanup at a property in the 114 Chambers Street vicinity.
Similarity score 0.984 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000106161
Mott & Prince Management letter dated March 14, 2002, responding to DEP inquiries about maintenance and re-occupancy at 114 Chambers Street.
Similarity score 0.981 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000120641
Laboratory report on ambient air samples collected in apartments and common areas of 333 Rector Place during September 24-26, 2001.
Similarity score 0.963 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000096362
Daily sign-in record for workers at the 68 Warren Street site during October 2001 restoration efforts.
Cited alongside this record in an Ask answer
NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
Cited alongside this record in an Ask answer
NYC-WTC_000155223
Notice requiring 114 Liberty residents to submit preservation lists before cleanup mobilization.
Cited alongside this record in an Ask answer
Weekly sign-in record for DEP Bureau of Air, Noise & Hazardous Materials staff in the Asbestos and Lead Program.
Cited alongside this record in an Ask answer
NYC-WTC_000163024
Request to tenants to provide lists of valuable items for removal before contractor mobilization.
Cited alongside this record in an Ask answer