NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 38/5 JOHN STREET; Block: 79; Lot: 14; BIN: 1001217
Document / 9 pages

Management Letter on Building Re-occupancy, Mar 2002

Machine-extracted title · confidence 95%

Letter from Mott & Prince Management regarding maintenance and re-occupancy issues at several buildings after the WTC collapse.

NYC-WTC_000108377–000108385

Folder label: “5 JOHN STREET; Block: 79; Lot: 14; BIN: 1001217

Page image
Scanned page image, NYC-WTC_000108385
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

r,zsw•.a 1 U8%AAlu.! 1Mt; Q 004 r..c.-V

-P2-

Time & Materials ContraetlWo* Autthorization Page -2-

START & COMPLETION DATES

• Approximate Work Commencement Date: • Approslmate Work Completion Date:

NOTE$ • During the course of performance of the wort, MAXONS may add additional labor and/or material above at rates to be determined by MAXONS. classifications to the schedule The Compensation paid performance of the work whicit are not listed in RATE SCHEDULE above MAXONS for any materials utilized by MAXONS in shall be equal to MAXONS' mate i cost for such services plus twenty-five percent (25%) MAXONS' mark-up on such costs.

• For those items of equipment for which rental is expressed as daily rate, the daily rental rate shall during which the equipment is in possession of a

apply to each 24-hour period MAXONS' personnel petiorming work, regardless of the such equipment is utilized during such 24-hour number of shifts on which period. The minimum rental period for daily rental equipment is one (1) day. • MAXONS shall be compensated for costs incurred for the the transportation back of equipment and any transportation of equipment and materials to the site of tM remaining supplies and materials, upon completion of the work and for MAXONS' cost (or such transportation plus twenty-live work, on the basis of percent (25%), MAXONS mark-up thereon. • Any alteration or deviation from the above specifications will be binding only when executed in vatting representative or project manager of MAXONS. and signed by a

• All agreements are contingent upon strikes, accidents or delays beyond our control. • Contractor will Certificate of Liability Insurance and Certificate of Workers Compensation Insurance prior to beginning the furnish

work on the contract

• Contractor will procure all permits required by law • Contractor and/or its subcontractor may have claim against the owner, which may be enforced under New York Lien Law • Contractor is legally required to deposit payments received prior to contractor may post a bond or contract the indemnity whit the owner completion and that, instead of making these deposits. the all

guaranteeing the return of proper payment under the cons-act • Any controversy or arising out of or relating to the work performed by Maxons shall be settled by arbitration in claim

Now York under the Rules then obtaining of the American Arbitration Association. Maxons Shall have all rights to the City of remedies, which it would have at law or equity notwithstanding this provisional agreement to arbtbate. • In the event it becomes necessary to place this contract for collection, the undersIgned accepting this contract agrees to pay costs of collection including reasonable attorney fees and court all costs. MAXONS RESTORATIONS, INC.

By: NYC License 61024157)

ACCEPTANCE OF CONTRACT The above specifications and conditions are satisfactory and are hereby accepted. MAXONS RESTORATIONS. INC. is do work as specified. Pe manta will be outlined above. authored to

Accepted by u*e , 4ate: Nor/CA VOL" the Buyer, csncrtThss ab r y

scr/on

T'1n9t1aib briefl WiIdn1ght of the third bUsrness day *Roe the data of this tranaseUon

"4:D0

- TO-SZ :8O Vbt'

d

£O -

000108385 NYC-WTC

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000108385Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.