NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 38/5 JOHN STREET; Block: 79; Lot: 14; BIN: 1001217
Document / 9 pages

Management letter on WTC building re-occupancy, Mar 2002

Machine-extracted title · confidence 50%

Letter from Mott & Prince Management responding to DEP inquiries about maintenance and re-occupancy at several buildings.

NYC-WTC_000108368–000108376

Folder label: “5 JOHN STREET; Block: 79; Lot: 14; BIN: 1001217

Page image
Scanned page image, NYC-WTC_000108376
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

..nav,..a ne..`2auA1j1ltq APR; X1004

Tinge & Materials ContracilWark Authorisation Page -2-

START & CQMPLETION DATES

• Approximate Wont Commencement Date: • Approalmata Work Completion Date:

NOTES • During the course of performance of the work, MAXONS may add additional labor and/or material classifications above at rates to be determined by MAXONS. The to the schedule Compensation paid MAXONS for any materials utilized by performance of the work which are not listed in RATE MAXONS in twenty-five percent (25%) MAXON$' mark-up on such SCHEDULE above shall be equal to MAXONS' cost for such services plus costs. • For those items of equipment for which rental is expressed as a daily rate, the daily rental rate shell during which the equipment is in poccecsion of apply to each 2 -hour period MAXONS' personnel peitorming work regardless of the such equipment is Util¢ad during such 24-hour period. The number of shifts on which minimum rental period for daily rental equipment is one (1) day. • MAXONS shalt be compensated For costs incurred for the the transportation back of equipment and any transportation of equipment and materials to the site of the remaining supplies and materials, Upon completion of the Work, work and for MAXONS cost for such transportation plus twenty41ve on the basin of percent (25%). MAXONS mart-up thereon. • Any alteration or deviation from the above specifications will be binding only wtwrl executed in writing representative or project manager of MAXONS. and signed by a

• All agreements are contingent upon strikes, accidents or delays beyond our control. • Contractor will furnish Certificate of Liability Insurance and Certificate of Workers Compensation Insurance prior to work on the contract beginning the

• Contractor will procure all permits required by law

Contractor and/or its subcontractor may have claim against the owner, which may be enforced udder New York Lien low • Contractor is 109211y required to deposit all payments received prior to completion and that. Instead of making these deposits, contractor may post a bond or contract the indemnity with the owner the guaranteeing the return of proper payment under the contract • Any controversy or claim arising out of or relating to the work performed by Maxons shall be settled by arbitration in the City of Now York under the Rules then obtaining of the American Arbitration Association. Maxons shall have all rights to remedies, which it would have at law or equity notwithstanding this provisional agreement to arbitrate. • In the event it becomes necessary to place this contract for collection. the undersigned accepting this contract agrees to pay costs of collection including reasonable attorney fees and court costs. all

MAXONS RESTORATIONS, INC.

By: NYC License 102415T)

ACCEPTANCE OF CONTRACT The above specifications and conditions are satisfactory and are hereby accepted. MAXONS do work as specified. Pa merits will be outlined above. RESTORATIONS. INC. is authorized to

Accepted Hy ue l

)t) Date:___________________ y r

Qp,4 Nonce! You, the buyer, ray cancofThss de c,ton *Tiii7iThT. DsfoflofiIm1nlghc of the third bustmes: day after the date of this traeasetlon

£O - d t/1E:80 10-5Z - "4 DO

NYC-WTC 000108376

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000108376Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000108377 · Box DEP Box 38

Letter from Mott & Prince Management regarding maintenance and re-occupancy issues at several buildings after the WTC collapse.

Filed in the same folder

Compare copies and versions →