PAGE 11
i.wt-+l c~ Cc~ja f '{u ~t'Gctiikit"
An ACP7 form Sigeed
by the contractor and air-monitoring firm
representative on site The DEP shall shall be submitted directly to the DEP
provide notification to the NYS DOL.
specified area, shall be indicated on The size of the project,
the ACF7 form.. Building owners
to the DEP for the work activities. shall provide written authorization
DEP will coordinate activities with
building owners and other city agencies.
The sites and specific areas to be
cleaned shall be determined and specified by
the DEP.
The contractor shall restrict access by
the public to the work area (s)
tape and warning signs shall be during clean-up activities. Caution
used to identify work areas. Access
employees, and Federal, State or local shall be limited to the contractor, his
oficials.
The contractor shall provide all
necessary
waste. The contractor is responsible for equipment, to remove, bag,ixFort, and dispose collected
supplying
PF S'ing all necessary equipment.
The saecife clean-up procedures
for building roofs are attached
the specified methodologies consider of
only if the request is received in writing.
prior approval by the DEp. Any
DEE'substituti must receirve
For large asbestos clean-up projects, a
partial decontamination system
be required at an entry/exit from (changing room and shower) shall
each work area. A remote
with DEP on-site approval. decontamination system shall be acceptable
Contractor Qualifications
The contractor shall have on staff and
assigned to the contract a sufficient
certified workers. See above. number of properly trained and
Page 2
05/03/02
NYC-WTC 000118417