NYC 9/11 Public Portal Document
~~• ~~~ ~aa~ 16:23 2124838895 CRG
PAGE 11
An ACP7 form signed)by the
contractor and air-monitoring firm shall be
representative on site. The DEP shall submitted directly to the DEP
specified area, shall be indicated on provide notification to the NTYS IDOL. The
the ACP7 form.. Building owners shall size of the project,
to the DEP for the work provide written authorization
activities.
DEF will coordznate activities
with building owners and other city
agencies.
The sites and specific areas to be
cleaned shall be determined and specified by
the DEP.
The contractor shall restrict access by
the public to the work area (s)
tape and warning signs shall be during clean-up activities. Caution
used to identify work areas. Access
employees, and Federal, State or local shall be limited to the contractor, his
officials.
The contractor shall provide all
necessary equipment, to remove, bag, txansx►art, and dispose collected
waste. The contractor is responsible for supplying all necessary
equipment.
The sj ecific clean-up procedures
for building roofs are attached. The
the specified methodologies only DEP shall consider substitution of
if the request is received in writing.
prior approval by the DEP. Any substitutions must receive
For large asbestos clean-up projects,
a partial decontairtination
be required at an entry/exit from system (changing room and shower) shall
each work area. A remote
with DEP on-site approval, decontamination system shall be acceptable
oC ntractor Oualifcatioas
The contractor shall have on
staff and assigned to the contract a
certified 'workers. See above. sufficient number of properly trained and
Page 2
05103/02
NYC-WTC 000118393
OCR can misread numbers and units. Confirm readings against the page image before using them.