An ACP7 form signed by the contractor and
air-monitoring firm shall be submitted directly to
representative on site. The DEP shall provide the: DEP
specified area, shall be indicated on the notification to the NYS DOL. The size of the project,
to the DEP for the work activities. ACP7 form.. Building owners shall provide written
authorization
DEP will coordinate activities with
building owners and other city agencies.
The sites and specific areas to be cleaned
shall be determined and specified by the DEP.
The contractor shall restrict access by the
public to the work area (s) during clean-up activities.
tape and warning signs shall be used to Caution
identify work areas. Access shall be limited to the
emjployees, and Federal, State or local contractor, his
officials.
The contractor shall provide all necessary
waste. The contractor is responsible for equipment, to remove, bag' transport, and dispose Collected
supplying
PP y~8 all necessary equipment.
The specific clean-up procedures for building
the specified methodologies only if roofs are attached. The DEP shall consider
the request is received in writing. Any substitution of
prior approval by the DEF. substitutions must receive
For large asbestos clean-up projects, a partial
be required at an entry/exit from each decontamination system (changing room and shower) shall
work area. A remote decontamination system
with DEP on-site approval, shall be acceptable
Contractor Qualifications
The contractor shall have on staff and
assigned to the contract a sufficient number of
certified workers. See above. properly trained and