NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.3
☕ Buy me a coffee
← Document results/Asbestos - BOX 2/83 NASSAU STREET 1001213, 79/3
Document / 17 pages

DEP Final Notice Regarding WTC Debris Cleanup, 83 Nassau Street,

Machine-extracted title · confidence 90%

Final notice urging building owner to participate in city debris cleanup program for exterior surfaces.

NYC-WTC_000100652–000100668

Folder label: “83 NASSAU STREET 1001213, 79/3”

Page image
Scanned page image, NYC-WTC_000100664
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

FILE No.132 09/05 '02 16:44 ID: FAX: PAGE 13

An ACP7 form signed by the contractor and air-monitoring firm shall be submitted directly to the DEP representative on site. The DEP shall provide notification to the NYS DOL. The size of the project, specified area, shall be indicated on the ACP7 form.. Building owners shall provide written authorization to the DEP for the work activities.

DEP will coordinate activities with building owners and other city agencies.

The sites and specific areas to be cleaned shall be determined and specified by the DEP.

The contractor shall restrict access by the public to the work area (s) during clean-up activities. Caution tape and warning signs shall he used to identify work areas. Access shall be limited to the contractor, his employees, and Federal, State or local officials.

The contractor shall provide all necessary equipment, to remove, bag, transport, and dispose collected waste. The contractor is responsible for supplying all necessary equipment_

The specific clean-up procedttres for building roofs are attached.. The t)13T' shall consider substitution of the specified methodologies only if the request is received in writing. Any substitutions must receive prior approval by the DE.F.

For large asbestos clean-up projects, a partial decontamination system (changing room and shower) shall be required at an entry/exit from each work area. A remote decontamination system shall, be acceptable with DEP on-site approval.

Contractor Oualifcations

The contractor shall have on staff and assigned to the contract a sufficient number of properly trained and certified workers. See above.

Page 2 05/03/02

NYC-WTC 000100664

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000100664Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →