NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 45/205 PEARL STREET 1001121, 68/7501
Document / 2 pages

Asbestos inspection log, 205 Pearl Street, Sept 2002

Machine-extracted title · confidence 93%

Inspection log detailing roof and facade cleanup activities at 205 Pearl Street with air monitoring by certified technicians.

NYC-WTC_000115118–000115119

Folder label: “205 PEARL STREET 1001121, 68/7501

Page image
Scanned page image, NYC-WTC_000115118
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document Jans TriaLda'e - Asbestos Inspection Report Premise No. Floor ROOF É FACADE Zip 10038 Inspector Dennis Antzoulatos 205 PEARL STREET Borough 1 Building Type MIXEO USE Contractor's Name Benjamin Kurzban & Son Control Address City 1248 Ralph Avenue, Brooklyn State NY Zip Phone 11236 (718)531-2900 Laboratory Name Warren & Panzer Engineers Inc. Address City 228 East 45 Street New York State NY Zip Phone 10017 (212) 922-0077 Contact Person Block 68 Lot Squad# 7501 Basis of Inspection N/A WTCSurvey Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name Inspection Date: As NOTED TBadge # A020 Photos Taken (Yes No Address City State Zip Phone Time of Inspection from: A3 NOTED TUESDAY SEPTEMBER 10 2002 (0800AM- 0600PM) THE ROOF AREA OF THE ADLACENT BUILDINGI 211 PEARL STREET, OCRURS SAMPUNG THE ROOF AREAS OF THESE TWO BUrDINGS WILL BE TREATED AS ONE WORK ARFA, A PEMOTE DECONTAMINATION UNIT IS ERECTED ON THE ROOF OF THE PREMISE AIR SAMPUNG FOR THIS PORTION DF THE CLEAN UP PROVECT WUAS PERFORMED BY FAYED ELGENDI (CERTIFICATE M AH-O1 11631 EXP 03/03), AlR SAMPUES ARE SET UP ON THE ROOF OF THE ADSACENT BURDING 101 MAIDEN LANE. WEDNESDAN No woRK SEPIEMBER 11 2002 ACTIVITIES ARE SCHEDULED TOPAYe THURSDAY SERTEMBER 12 2002 THE CUEAN UP OF THE DOOF WORK AREA IS COMPLETED. CUEAN UP ACTIUITIES BEGIN ON THE REAR CWEST) FACADE OF THE PREMISE A1B SAMPUNG FOR THIS PORTION OF THE CUEAN UP PROIECT WAS PERFORMED BY JOHN BOVD (CERTIFICATE # AH 90-05530 E2P 01lo3 >. FRIDAR SEPTEMBER 13 2002 THE CUEAN UP OF THE WEST CREAR) FACADE IS COMPLERED. CUEAN UP ACTIVITES BEGIN IN THE SET BACK WORK AREA. AlR SAMPUNG IS PERFORNED BY JOUN BOYD. TOR THE PURPOSES OF AIR MONITORING THE SETBACK WORK AREAS OF 205, 211, 213, AND 21S PEARL STREET ARE TREATED AS ONE WORK AREA. TUE CUEAN UP ACTIVITES AT THESE FOUR PREMSES OCCURS SIMULTANEOUSLM. NYC-WTC_000115118

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000115118Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

WTC site personnel sign-in sheet · Box DEP Box 01

NYC-WTC_000094348

Site access and personnel record sheet for World Trade Center environmental remediation project documenting contractor staff, badge assignments, and work site access.

4 shared non-person entities · 1 shared topics · similarity 0.967

machine-extracted · confidence unavailable · Check page ↗

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →