NYC 9/11 Public Portal Document
...
Asbestos Inspection Report
•.
Premise No.
205 PEARL STREET
Inspector
Dennis Antzoulatos
Inspection Date:
AS NOTED
Page z of z
SATURDAY SEPTEMBER / 2002
THE
CLEAN UP
OF THE SETBACK WORK
AREA IS COMPLETED. AIR.,
SAMBLINGI
WAS PERFORMED BY JOHN BOYD.
AT THE COMPLETION OF THE
CLEAN UP
ACTIVITIES
A VISUAL INSPECTION OF THE CUANED WORK AREAS
WAS CONPUCTED BY JOHN BOXD OF WARREN $ PANZER.
NO VISIBLE LUSTC
DEBRIS WAS OBSERUED.
BUNDAY.
THE CUEAN UP OF THE EAST FACADE (PEARL ST) WAS CONDUCTED
JODAY. THE FACADE CIEAN UP INNOLUED THE HEPA VACUUMING AND
WINDOW
SURFACES.
A DECON TRUEK WAS
UTILIZED. NO PLASTIC DUKE WAS CONSTRUCTED (NO WATER BUN OFF).
AlR MONITORING FOR THIS PORTION OF THE CIEAN UP PROJECT WAS
PERFORMED B4
OCHOGHO ERHABOR (CERTIFICATE # AH 00-16198 ERP 12/02)
OF WARREN E PANZER.
UPON COMPLETION DF THE CUEAN UP ACTIVITES
I CONDUCTED A VISUAL OF THE
CUEANED FACADE SURFACES AND I
OBSERUED NO VISIBUE WUTC DEBRIS.
A POOM TRUCK WAS USED TO
ACCESS THE FACARE SURFACES.
THE CUEAN UP PROJEUT AT THIS
PREMISE IS NOU COMPLETE:
NYC-WTC_000115119
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000115119Source: NYC Law Department, mirrored locally
Site access and personnel record sheet for World Trade Center environmental remediation project documenting contractor staff, badge assignments, and work site access.