NYC 9/11 Public Portal Document
TOTAL FEET: 53910 0
NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION Basis of Inspection:
ASBESTOS INSPECTION REPORT LTRU0907MN02_;
FEE EXEMPT: Yes
ONLY TYPEWRITTEN
APPLICATIONS WILL BE NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED 1. $0.00
ACCEPTED
TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE Li Variance
OF START OF THE WORK (ABATEMENT ACTIVITIES)
START DATE: 6/18/02 PROJ. COMPLETION DATE: 7/17/02
I. FACILITY
ADDRESS: 26 WALL STREET BORO: MANHATTAN ZIP: 10005
TYPE OFFACILITY: BLOCK: 43 LOT: 6
1I. BUILDING OWNER
NAME: UNITED STATES DEPT. OF INTERIOR Contact Idave lunchsinger
TEL. #: (212) 8256990
ADDRESS: n/a n/a CITY: manhattan STATE: ny ZIP: n/a
N. ASBESTOS ABATEMENT CONTRACTOR
NAME: #Error
TEL. #: (718) 961.4100 FEDERAL EMPLOYER IDENTIFICATION N: _______________PII
ADDRESS 14.20 129TH STREET CITY: COLLEGE POINT STATE: ]N ZIP: 11356
VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/0 WARREN & PANZER E
NYS ELAP #: 11251
ASBESTOS WORK SCHEDULE —J DAY L.1 EVENING ❑ NIGHT LJ WEEKENDS ❑ WEEKDAYS
INSPECTOR NAME: Irr .' _ v..~Tt~1tv~~p„k SQUAD #: BADGE #:
DATE OF INSPECTION: /„ /.'9 / Q 2! TIME OF INSPECTION: From: AM A PM l—
v To: •_I l~ AM fl PM
Contact at site: dave lunchsinger oC ~.et Qt.y.• I ~~ _ ---
Inspection disclosed that the following sections were co ied with: (Check all that apply)
51 Notifications, Reports, Pla 1.7 •Air Sampling and Monitorin 1 - Worker Protection
I i 1.101 Materials and Equipment 1.116 - Work Place Preparation C 1.117 - Worker Decontamination System.
1.118 - Waste Decontamination System 1.126 - Engineering Controls G •127 • Entry/Exit Procedures I
1.129 • Maintenance of Barriers 1-138 •Encapsulation 1.139. Enclosure
1.140 - Glovebag 1-141 •Tent 1.137 - ACM Disturbance, RemoveL, Handling
,
( 1.146 • Preliminary Cleanup 1.147 - Final Cleanup
Project not started . Inspection
revealed all ACM to be intact. New start date: / /
Project ongoing, expected completion date: / 3 /o Z
Project completed on or about / / . All surfaces, including abated surfaces are free of visible ACM and encapsulat
1 Follow up necessa on / / --~
S amples taken: Yes 1 2 3
4 -- — — _ -- 5 6 Photos taken: Yes C No— I
1 L 1
—Additional comments:
~ `+.Ow.w~_ t~ - .~,r6~Ca~w.w— Iv2 1,, eVF~ana ~e•. ~ e~ ~----+
u~R. w OTC Coot. r<~ tw
L a .~W
(J en~. 'G3E'►M.w. M1 _ IMti
uE^
NBC - Iu cL+... _ . 1.1..
RESULT CODE
BORO 1 = MANHATTAN 2 =MBRONX 3 = BROOOKLYN 4 = QUEENS 5 = STATEN ISLAND
RESULT CODES ' 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS VISOR INI - I
~SU
4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV)
NYC-WTC 000112267
OCR can misread numbers and units. Confirm readings against the page image before using them.