NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 38/No folder label
Document / 14 pages

Asbestos Abatement Scope of Work, Aug 2002

Machine-extracted title · confidence 95%

Document outlining mandatory pre-bid meeting and scope for asbestos abatement contractor work at a WTC building.

NYC-WTC_000107393–000107406
Page image
Scanned page image, NYC-WTC_000107401
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

2 Cleaning shall nut be considered cuuipete unless apartment will be re the primary -cleaned and retested ;f the clearance levels are clearance levels may be primary clearance achieved. The and analytical re-evaluated and revised if levels are not determined be necessary based onachieved. These I;,n;[a[ions, Secondary additioic cleanup, however clearance levels shall ed field conditions failure to 111 consider trigger the re-cleaning. secondary clearance determining levels does nottautomati all Yy Nruiect oiitorin~

1. The project monitor shall provide specifications, tenants oversight of clean-up authorizations, activities to shall be present on site during all and applicable rules and cleaning ensure compliance with Project regulations. scheduling requirements fur timely completionactivities, of the The project moni tor The work Project monitor shall coordinate all and cleaning acti vities within three co l 3 weeks. () work valuable items in each unit as provided The project by tenants. A copy of the nreparatio f monitor shallcomaintain heai attached. For additional and ventory of specific tasks, refer to this attachment ntractor requirem ents is . 2. "l'he project monitor shall provide the scope-of=work, daily ntoniturittg of the applicable rules all work activities and regulations, and to "'sure limited to the verification of worker the contracts. This compliance with appruprlate wuik practices cenitication status, the use includes but is not of proper engineering controls and 3 ']'he project monitor shall direct work until corrections are made. corrective actions Findings must be when reported appropriate and shall be responsible to stop Written nutificat►un of observation hours of telephone call. and corrective action s immediately p to DEP must be received bytheaDEp within 48 4 A final rep ,'[ shall be subntiued to clearly identity the work performed the witl►in DEP unit in each andS shall days include of project c custody forms, field notes, copies of employee u1nplcttun The report shall all la authori~ [tuns etc credentials (i.e . certifi at s), tenant and owner

5 of 5

NYC-WTC 000107401

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000107401Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Resident Cleaning Request Form, Oct 2002 · Box DEP Box 38

NYC-WTC_000107379

Formal request by a resident for the Department of Environmental Protection to perform cleaning and monitoring work at their apartment.

16 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.985

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →