NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 38/No folder label
Document / 14 pages

Asbestos Abatement Scope of Work, Aug 2002

Machine-extracted title · confidence 95%

Document outlining mandatory pre-bid meeting and scope for asbestos abatement contractor work at a WTC building.

NYC-WTC_000107393–000107406
Page image
Scanned page image, NYC-WTC_000107402
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

2. Cleaning shall not be considered apartn►ent will be le-cleaned cun,pete unless the primary and retested ;f the clearance levels are clearance levels may be Primary clearance achieved. The and analytical re-evaluated and revised if levels are not a determined be necessary based onachieved These limitations. Secondary aan l ytic cleanup clearance levels shall field conditions however failure cl to meet the , considered determining trigger the re-cleaning. secondary clearance levels doesenottaut omatically Y Pruiect Munituriu

1. The project monitor shall provide oversight specifications, tenants of clean-up authorizations, activities to ensure shall be present on and applicable rules compliance with project site during all and regulations. scheduling requirements for cleaning activities. The project The ject and cleaning activities timely completion of the work monitor shallo n t all coordinate within three (3) weeks. The project (completion monitor shall of work area preparation valuable i tems i n each unit as provided by tenants. A co attached. For additional and maintain the inventory of specific tasks, refer to this attachCopy of the contractor requirements is ment. 2 '1l project rnunitur shall Provide daily the scope-of work, uwniturmg of all work the applicable rules activities to insure I►n►rted to the and regulations, and the compliance with verification of worker appropriate work practices certification status, the use contracts. This includes but is not of proper engineering controls and 3, The project monitor shall direct work until corrections are made. corrective actions Findings must be when reported immediate) appropriate and shall be responsible to stop Written nutificatrun of observat iu, r and corrective actions hours of telephone call. to DEP via p must be received by the DE within w~ 48 4. A final report shall be sub►uitied to clearly identity the work performed the DEP unit in each within and5 shall days include all lab of project pletion The report shall custody forms, field notes, copies of employee credentials (i.e. authurn tiuns, etc orato ry reports, chain-ot= certificates)> tenant and owner

5 of 5

NYC-WTC 000107402

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000107402Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Resident Cleaning Request Form, Oct 2002 · Box DEP Box 38

NYC-WTC_000107379

Formal request by a resident for the Department of Environmental Protection to perform cleaning and monitoring work at their apartment.

16 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.985

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →