DEP response letter regarding cleanup scope, Apr 2003

Machine-extracted title · confidence 90%

Letter from DEP responding to an inquiry by enclosing scopes of work for environmental cleanup at 125 Cedar Street.

NYC-WTC_000107169–000107186

Folder label: “125 CEDAR ST.

Page image
Scanned page image, NYC-WTC_000107183
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

2. Cleaning shall not be considered compete unless the primary clearance levels are achieved. The apartment will be re-cleaned and retested if the primary clearance levels are not achieved. These clearance levels may be re-evaluated and revised if determined necessary based on field conditions and analytical limitations. Secondary clearance levels shall be considered in determining the need for additional cleanup, however failure to meet the secondary clearance levels does not automatically trigger the re-cleaning.

Project Monitoring

The project monitor shall provide oversight of clean-up activities to ensure compliance with project specifications, tenants authorizations, and applicable rules and regulations. The project monitor shall be present on site during all cleaning activities. The project monitor shall coordinate all scheduling requirements for timely completion of the work (completion of work area preparation and cleaning activities within three (3) weeks. The project monitor shall maintain the inventory of valuable items in each unit as provided by tenants. A copy of the contractor requirements is attached. For additional and specific tasks, refer to this attachment.

2. The project monitor shall provide daily nonitoriug of all work activities to insure compliance with the scope-of-work, the applicable rules and regulations, and the contracts. This includes but is not limited to the verification of worker certification status, the use of proper engineering controls and appropriate work practices.

3. The project monitor shall direct corrective actions when appropriate and shall be responsible to stop work until corrections are made. Findings must be reported immediately to DEP via telephone call. Written notification of observation and corrective actions must be received by the DEP within 48 hours of telephone call.

4. A final report shall be submitted to the DEP within 5 days of project Completion. The report shall clearly identify the work performed in each unit and shall include all laboratory reports, chain-of- custody forms, field notes, copies of employee credentials (i.e. certificates), tenant and owner autltorizatioiis, etc.

5 of 5

NYC-WTC 000107183

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000107183Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Resident Cleaning Request Form, Oct 2002 · Box DEP Box 38

NYC-WTC_000107379

Formal request by a resident for the Department of Environmental Protection to perform cleaning and monitoring work at their apartment.

20 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.997

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.