Pre-bid meeting notice for 125 Cedar Street cleaning

Machine-extracted title · confidence 90%

Notice of a mandatory pre-bid meeting and scope for asbestos abatement at 125 Cedar Street in August 2002.

NYC-WTC_000097066–000097082

Folder label: “125 Cedar

Page image
Scanned page image, NYC-WTC_000097071
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

2. Cleaning shall nut be considered compete unless the primary clearance levels are achieved. The apartment will be re-cleaned and retested if the primary clearance levels are not achieved. These clearance levels may be re-evaluated and revised if determined necessary based on field conditions and analytical limitations. Secondary clearance levels shall be considered in determining the need for additional cleanup, ho"ever failure to meet the secondary clearance levels does not automatically trigger the re-cleaning.

Project Monitoring

1. The project monitor shall provide oversight of clean-up activities to ensure compliance with project specifications, tenants authorizations, and applicable rules and regulations. The project monitor shall be present on site during all cleaning activities. The project monitor shall coordinate all scheduling requirements for timely completion of the work (completion of work area preparation and cleaning activities within three (3) weeks. The project monitor shall maintain the inventory of valuable items in each unit as provided by tenants. A copy of the contractor requirements is attached. For additional and specific tasks, refer to this attachment.

2. The project monitor shall provide daily Monitoring of all work activities to insure compliance with the scope-of-work, the applicable rules and regulations, and the contracts. This includes but is not limited to the verification of worker certification status, the use of proper engineering controls and appropriate work practices.

3. The project Monitor shall direct corrective actions when appropriate and shall be responsible to stop work until corrections are made. Findings must be reported immediately to DEP via telephone call. Written notification of observation and corrective actions must be received by the DEP within 48 hours of telephone call.

4. A final report shall be submitted to the DEP within 5 days of project completion. The report shall clearly identify the work performed in each unit and shall include all laboratory reports, chain-of- custody forms, field notes, copies of employee credentials (i.e. certificates), tenant and owner authorizations, etc.

5 of 5

NYC-WTC 000097071

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000097071Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →