NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No. Inspection Date:
114 Liberty Street March 8, 2003
Floor Zip Borough Block Lot Squad # Badge #
All 10006 1 (Manhattan) 52 7502 N/A A019
Inspector Building Type Basis of Inspection Photos Taken
Penny Theodorellys A WTC Unoccupied Bldg DEP Cleanup No
Contractor's Name Sample Number
ETS Construction, Inc N/A
Address City Sample Number
160 Clay Street, Brooklyn N/A
State Zip Phone Sample Number
NY 11222 (718) 706-1032 N/A
Laboratory Name Owner's Name
JLC Environmental Consultants 114 Liberty LLC
Address City Address City
200 Park Avenue South, New York
State Zip Phone State Zip Phone
NY 10003 (212)420-8119
Contact Person Time of Inspection from:
7:15 A.M. — 3:45 P.M.
This inspection was the continued monitoring of the DEP dean-up activities at the site. All work to be
performed In accordance with contracts WTC-LBC and WTC-LBA. Clarifications and updates were provided to
the contractors and residents by e-mail. Copies of correspondence to be incorporated with these inspection
reports. The residents were given until today to complete the tagging of items for disposal, marking of walls to
be removed, and supplying lists of Items to be saved when not in accordance with the scope-of-work for the
project. Specifically, saved items were to Include appliances listed for disposal in the scope and valuables such
as antique furniture.
Contractor and Project Monitor representatives were present on site at my arrival. The project monitor was Mr.
Peter Koslowsky. The site supervisor was Mr. Marion Jawien (S Cert # 89021), the project manager was Mr.
Tom Alhem. Workers were donning PPE for entry to the residential portion of the building. Workers were as
follows: Bandera H 88641, Reyes H 90773, Mendez H 87870, Sykorjak H 87885, lancitch H 86844, Perciun H
92167, Lituma H 90122, Mendez H 83529, Quinde H 88389, Gomez H 86254, Nosorowski H87515, Garda H
85678, Kostak H 90943.
Work place preparation activities were in progress. Decons were operational. Areas around the decons were
being maintained by one of the workers. Waste containers were not delivered to the site yet. Drop off of the
containers was expected sometime in the evening.
Mr. Koslowsky, Mr. Alhem, and I began a floor by floor videotaping of walls, floors, cabinet components, and
personal items. Negative air machines were installed. Isolation barriers were installed.
A resident of 125 Cedar Street reported concerns regarding the negative air machine exhausting location.
Although the exhausting was In compliance, Mr. Alhem agreed to change the location.
Work progress was in keeping with project timeframes.