(F) Service Openings: The contractor shall utilize service openings, as required for
proper cleaning, at various points of the HVAC system for physical and mechanical
entry, and inspection.
1. Contractor shall utilize the existing service openings already installed in the
HVAC system where possible.
2. Other openings shall be created where needed and they must be created so
they can be sealed in accordance with industry codes and standards.
3. Closures must not significantly hinder, restrict, or alter the airflow within the
system.
4. Closures must be properly insulated to prevent heat loss/gain or condensation
on surfaces within the system.
5. Openings must not compromise the structural integrity of the system.
6. Construction techniques used in the creation of openings shall conform to
requirements of applicable building and fire codes, and applicable NFPA,
SMACNA and NADCA Standards.
7. Cutting service openings into flexible duct is not permitted. Flexible duct shall
be disconnected at the ends as needed for proper cleaning and inspection.
8. All service openings capable of being re-opened for future inspection or
remediation shall be clearly marked and shall have their location reported to the
NYCDEP, with a copy to the building owner, in project report documents.
(G) Ceiling sections (tile): The contractor may remove and reinstall ceiling sections to
gain access to HVAC systems during the cleaning process.
(H) Air distribution devices (registers, grilles & diffusers): The contractor shall clean all
air distribution devices.
(I) The contractor shall insure that supply fans and blowers are thoroughly cleaned.
Areas to be cleaned include blowers, fan housings, plenums, scrolls, blades, or vanes,
shafts, baffles, dampers and drive assemblies. All visible surface contamination deposits
shall be removed in accordance with NADCA Standards. Contractor shall:
1. Clean all air handling units (AHU) internal surfaces, components and
condensate collectors and drains.
2. Assure that a suitable operative drainage system is in place prior to beginning
wash down procedures.
3. Vacuum clean and pressure wash all coils and related components, including
evaporator fins.
4. Replace existing filters.
(J) Duct Systems: Contractor shall:
1. Create service openings in the system as necessary in order to accommodate
cleaning of otherwise inaccessible areas.