NYC-WTC_000163408
Second addendum to monitoring scope including HVAC system checklist and inspection procedures.
10 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
ADDENDUM #2 World Trade Center Dust Cleaning Program Monitoring Contract Scope of Work
Determine the components that are accessible. At minimum, representative surfaces of the following system components should be inspected:
— air intake (outdoor or return) — air intake dampers — return air grilles — return air plenum — horizontal surfaces — impingement points (e.g. turning vanes, elbows, transitions) — filter racks and filter media — blower — thermal coils — interior surfaces of the supply air ducts — horizontal surfaces — impingement points (e.g. turning vanes, elbows, transitions) — volume dampers — terminal boxes — supply diffusers
Note that depending on the size and complexity of the HVAC system, access may require the use of ladders, lifts or scaffolds using appropriate methods of fall protection.
6.5.1.2 Methods of Access
The following list summarizes methods of accessing HVAC system components for inspection:
— through existing service openings (i.e., access doors and panels) — by disassembly of housing — by installation of service openings (may range from 1" diameter holes to access doors)
The HVAC/Electrical Professional shall assess the accessibility of each HVAC system component to be inspected. If an HVAC system component is not accessible, the Environmental Professional shall be consulted to determine whether installation of a service opening will likely disturb asbestos-containing materials. After such consultation, if approved by the Environmental Professional, the HVAC/Electrical Professional shall install service openings as needed to inspect the HVAC components listed in 6.5.1.1.
NOTE: Disassembly of housing and installation of service openings may only be performed by the HVAC/Electrical Professional and replacement plates, panels or access doors shall be installed in accordance with NFPA, NADCA and SMACNA standards and NYC building codes.
NYC-WTC 000140417
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000163408
Second addendum to monitoring scope including HVAC system checklist and inspection procedures.
10 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140472
Addendum detailing all ventilation system components to be inspected and cleaned, including intake louvers, ducts, coils, blower assemblies, and duct linings at World Trade Center.
1 shared non-person entities · 1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140297
Addendum defining scope for cleaning World Trade Center dust from ventilation components including ducts, coils, and filters.
1 shared non-person entities · 1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140470
Guidelines for evaluating direct exhaust systems and identifying dust accumulation points in residential ventilation equipment.
1 shared non-person entities · 1 shared topics · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140295
Identification of ventilation system components most likely to have WTC-related dust accumulation, including air intakes, dampers, filters, and downstream components.
1 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140298
Addendum defining inspection scope for HVAC components at World Trade Center sites to assess dust accumulation.
2 shared non-person entities · 1 shared topics · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140475
Criteria for distinguishing WTC dust from other contaminants and determining the need for cleaning or sampling.
9 shared non-person entities · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140473
Addendum specifying accessible HVAC components for inspection and methods for accessing system elements during World Trade Center dust evaluation.
2 shared non-person entities · 1 shared topics · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140300
Scope of work detailing evaluation procedures for HVAC systems to assess World Trade Center dust impact and cleaning recommendations.
9 shared non-person entities · similarity 0.955
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140291
Bibliography section listing standards from NADCA and SMACNA required for conducting World Trade Center dust evaluations in HVAC systems.
1 shared non-person entities · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140466
Document listing applicable standards like ACR 2002 and NADCA 97-05 for the assessment and cleaning of HVAC systems.
1 shared non-person entities · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140471
Addendum listing required inspection equipment and typical HVAC system components for World Trade Center dust cleaning.
1 shared non-person entities · 1 shared topics · similarity 0.952
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000163408
Second addendum to monitoring scope including HVAC system checklist and inspection procedures.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140298
Addendum defining inspection scope for HVAC components at World Trade Center sites to assess dust accumulation.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140473
Addendum specifying accessible HVAC components for inspection and methods for accessing system elements during World Trade Center dust evaluation.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140297
Addendum defining scope for cleaning World Trade Center dust from ventilation components including ducts, coils, and filters.
Similarity score 0.967 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163408
Second addendum to monitoring scope including HVAC system checklist and inspection procedures.
Similarity score 0.967 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140472
Addendum detailing all ventilation system components to be inspected and cleaned, including intake louvers, ducts, coils, blower assemblies, and duct linings at World Trade Center.
Similarity score 0.966 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000150329
Memorandum submitting working drafts of staging and disposal plans for World Trade Center debris at Staten Island Landfill.
Cited alongside this record in an Ask answer
NYC-WTC_000148952
Table listing volatile organic compound (VOC) sampling sites and dates outside of Ground Zero from September 2001 to January 2002.
Cited alongside this record in an Ask answer
NYC-WTC_000149199
Department of Environmental Protection advisory letter dated October 25, 2001, addressed to residents of Lower Manhattan.
Cited alongside this record in an Ask answer
NYC-WTC_000150251
Draft report evaluating dust generation during WTC debris sorting at Staten Island Landfill.
Cited alongside this record in an Ask answer
NYC-WTC_000163408
Second addendum to monitoring scope including HVAC system checklist and inspection procedures.
Cited alongside this record in an Ask answer