machine-extracted · confidence unavailable · Check page ↗HVAC monitoring addendum to scope of work, August 2002
Machine-extracted title · confidence 70%Second addendum to monitoring scope including HVAC system checklist and inspection procedures.
NYC-WTC_000163408–000163426Folder label: “E-mails M. Gilsenan”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
ADDENDUM #2 World Trade Center Dust Cleaning Program Monitoring Contract Scope of Work
Determine the components that are accessible. At minimum, representative surfaces of the following system components should be inspected:
— air intake (outdoor or return) — air intake dampers — return air grilles — return air plenum — horizontal surfaces — impingement points (e.g. turning vanes, elbows, transitions) — filter racks and filter media — blower — thermal coils — interior surfaces of the supply air ducts — horizontal surfaces — impingement points (e.g. turning vanes, elbows, transitions) — volume dampers — terminal boxes — supply diffusers
Note that depending on the size and complexity of the HVAC system, access may require the use of ladders, lifts or scaffolds using appropriate methods of fall protection.
6.5.1.2 Methods of Access
The following list summarizes methods of accessing HVAC system components for inspection:
— through existing service openings (i.e., access doors and panels) — by disassembly of housing — by installation of service openings (may range from 1" diameter holes to access doors)
The HVAC/Electrical Professional shall assess the accessibility of each HVAC system component to be inspected. If an HVAC system component is not accessible, the Environmental Professional shall be consulted to determine whether installation of a service opening will likely disturb asbestos-containing materials. After such consultation, if approved by the Environmental Professional, the HVAC/Electrical Professional shall install service openings as needed to inspect the HVAC components listed in 6.5.1.1.
NOTE: Disassembly of housing and installation of service openings may only be performed by the HVA C/Electrical Professional and replacement plates, panels or access doors shall be installed in accordance with NFPA, NADCA and SMACNA standards and NYC building codes.
NYC-WTC 000163421
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
No available related records indexed in this group.
Filed elsewhere
NYC-WTC_000140297
Addendum defining scope for cleaning World Trade Center dust from ventilation components including ducts, coils, and filters.
1 shared non-person entities · 1 shared topics · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140472
Addendum detailing all ventilation system components to be inspected and cleaned, including intake louvers, ducts, coils, blower assemblies, and duct linings at World Trade Center.
1 shared non-person entities · 1 shared topics · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140470
Guidelines for evaluating direct exhaust systems and identifying dust accumulation points in residential ventilation equipment.
1 shared non-person entities · 1 shared topics · similarity 0.960
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000132702
Inspection report documenting HVAC units at 176 Broadway identified as containing World Trade Center debris.
4 shared non-person entities · 1 shared topics · similarity 0.960
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140295
Identification of ventilation system components most likely to have WTC-related dust accumulation, including air intakes, dampers, filters, and downstream components.
1 shared non-person entities · 1 shared topics · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000099514
Inspection report listing rooftop units at 75-79-81 Nassau Street where possible World Trade Center debris was identified in November 2002.
4 shared non-person entities · 1 shared topics · similarity 0.959
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000132808
Inspection form for HVAC units at a NYC address dated November 6, 2002.
4 shared non-person entities · 1 shared topics · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000132707
Inspection report documenting HVAC units at 257 Water Street identified as containing World Trade Center debris.
4 shared non-person entities · 1 shared topics · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139232
DEP requests review of attached Scope of Work documents for mold remediation and air monitoring contracts.
8 shared non-person entities · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149899
Proposal for sampling and assessing building interiors in the vicinity of the World Trade Center site.
9 shared non-person entities · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115031
Inspection report for HVAC ducts at 261 Water Street checking for possible World Trade Center debris contamination.
4 shared non-person entities · 1 shared topics · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140298
Addendum defining inspection scope for HVAC components at World Trade Center sites to assess dust accumulation.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140473
Addendum specifying accessible HVAC components for inspection and methods for accessing system elements during World Trade Center dust evaluation.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.966 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140297
Addendum defining scope for cleaning World Trade Center dust from ventilation components including ducts, coils, and filters.
Similarity score 0.966 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140472
Addendum detailing all ventilation system components to be inspected and cleaned, including intake louvers, ducts, coils, blower assemblies, and duct linings at World Trade Center.
Similarity score 0.965 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000150329
Memorandum submitting working drafts of staging and disposal plans for World Trade Center debris at Staten Island Landfill.
Cited alongside this record in an Ask answer
NYC-WTC_000150251
Draft report evaluating dust generation during WTC debris sorting at Staten Island Landfill.
Cited alongside this record in an Ask answer
Cited alongside this record in an Ask answer
NYC-WTC_000148952
Table listing volatile organic compound (VOC) sampling sites and dates outside of Ground Zero from September 2001 to January 2002.
Cited alongside this record in an Ask answer
NYC-WTC_000149199
Department of Environmental Protection advisory letter dated October 25, 2001, addressed to residents of Lower Manhattan.
Cited alongside this record in an Ask answer