NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 43/E-mails M. Gilsenan
Document / 19 pages

HVAC monitoring addendum to scope of work, August 2002

Machine-extracted title · confidence 70%

Second addendum to monitoring scope including HVAC system checklist and inspection procedures.

NYC-WTC_000163408–000163426

Folder label: “E-mails M. Gilsenan

Page image
Scanned page image, NYC-WTC_000163422
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ADDENDUM #2 World Trade Center Dust Cleaning Program Monitoring Contract Scope of Work

The Environmental Professional shall repair or seal any interior/exterior duct insulation disturbed by the installation of service openings.

6.5.2 Methods of Evaluation

6.5.2.1 Visual Inspection Procedure

Visual inspection of the interior system components is required. Inspection of all of the Systran components, or as many components as possible is recommended. The HVAC/Electrical Professional and the Environmental Professional should jointly perform the visual inspection. At minimum, the components listed in 6.5.1.1 shall be inspected.

The visual inspection shall be accomplished using one or more of the following methods:

- direct examination - telescoping inspection mirrors and flashlights inserted through service openings - boroscopes inserted through supply air diffusers or other existing openings - remotely operated video camera

6.5.2.2 Assessment of Conditions

Visual Assessment

All required interior surfaces in contact with the air stream shall be inspected for visible accumulations of dust and/or debris. Inspect all surfaces in contact wife the air stream. Information indicates that some of the defining characteristics of WTC-related dust are that it contains extremely fine particles similar to talcum powder in consistency, is light-colored, contains pulverized concrete and/or gypsum wallboard, and may contain asbestos fibers. The visual inspection shall document:

A general description of the appearance of interior surfaces of the various system components. The description for each component will include, but may not be limited to:

interior duct/fan housing surfaces are porous/non-porous interior duct and fan housing surfaces are lined with insulation interior duct and fan housing surfaces are double-walled (i.e. interior insulation with perforated metal cover) filter loading, condition of filters and filter rack interior surfaces are ffee/not free of visible dust and debris or suspect WTC- related dust and debris description of dust color, level of dust loading that may include: - the depth of dust observed on each component (e.g., less than 1/16 inch, greater than or equal to 1/16 inch.).

NYC-WTC_000163422

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000163422Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →