NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION TOTAL FEET: 12678 0
ASBESTOS INSPECTION REPORT Basis of Inspection: cui-:SF. ,1F
oof , 5,509 0
TRU1103MN02 a a' 7,169, 0
ONLLTYPEORITEN FEE EXEMPT: Yes
APPLICATIONS WILL BE .- NOTE: ASBESTOS INSPECTION REPORT SHALL BE SUBMITTED
ACCEPTED 1- $0.00
TO NYC DEP NOT LESS THAN ONE WEEK IN ADVANCE
OF START OF THE WORK (ABATEMENT ACTIVITIES)
START DATE: 7/16/02 COMPLETION DATE: 7/30/02
I. FACILITY
ADDRESS: 110 LIBERT STREET/113.117 CEDER ST BORO: MANHATTAN ZIP: 10004
TYPE OFFACILITY: BLOCK: LOT:
II. BUILDING OWNER 1
NAME: BALDWIN REALTY, C/O CHARLES GANLER
TEL. #:
ADDRESS: n/a n/a CITY: n/a STATE: n/a ZIP: n/a
IV. ASBESTOS ABATEMENT CONTRACTOR
NAME: TRIO ASBESTOS REMOVAL CORPORATION
TEL #: (718) 961 4100 FEDERAL EMPLOYER IDENTIFICATION # : PII
ADDRESS: 14.20 129TH STREET CITY: COLLEGE POINT STATE: ]N ZIP: 11356
V. THIRD PARTY AIR MONITOR
NAME: WARREN & PANZER ENGINEERS, P.C. —_
TEL. If: (212) 922-0077
ADDRESS: 228 EAST 45TH STREET CITY: NEW YORK STATE: NY ZIP: 10017
VI. LABORATORY FOR SAMPLE ANALYSIS NAME: WKP LABORATORIES C/O WARREN & PANZER E
NYS ELAP #: 11251
ASBESTOS WORK SCHEDULE h' DAY V EVENING V NIGHT / WEEKENDS hI WEEKDAYS
INSPECTOR NAME: R. ROJY~7'yl'LO SQUAD #: - BADGE #: A79
DATE OF INSPECTION: 7 / 2-I /o_ TIME OF INSPECTION: From: g c,,.., AM j PM
To: t AM -,
Contact at site: S',mic _- n✓
Inspection disclosed that the following sections were complied with: (Check all that apply) -
1.51 - Notifications, Reports, Pla 1.71 - Air Sampling and Monitorin 1-91 -Worker Protection
1-101 - Materials and Equipment i 1-116. Work Place Preparation 1.117 - Worker Decontamination System
1.118 •Waste Decontamination System 1-126- Engineering Controls i_ 1.127- Entry/Exit Procedures
1.129 -Maintenance of Barriers i 1-138 • Encapsulation I_ 1-139 •Enclosure
1.140 - Glovebag I— j 1-141 - Tent r ; 1-137 •ACM Disturbance, RemoveL, Handling
1.146 • Preliminary Clean-up ( _ 1.147 - Final Clean-up
Project not started . Inspection
revealed all ACM to be intact. New start date:
Project ongoing, expected completion date:
Project completed on or about 7/ 2V,_ --/ O l surfaces, including abated surfaces are free of visible ACM and encapsulat
I Follow up necessary on
Samples taken: No [ 1 Yes 1 2 3
5 6 Photos taken: Yes No '
4
Additional comments: - - - ~---~ ~- --,
c
oQ — --._'y
o cQr~n {i a77 .c -.
- - - RESULT CODE
BORO 1 = MANHATTAN 2 = BRONX 3 = BR000KLYN 4 = QUEENS 5 = STATEN ISLAND
RESULT CODES 1 = VIOLATION ISSUED 2 = NO VIOLATION ISSUED 3 = NO ACCESS SUPERViSO NITIALS
4 = PROJECT NOT STARTED (NO NOV) 5 = PROJECT COMPLETED (NO NOV)