NYC 9/11 Public Portal Document
Regulatory Submittal Part I — Work Plan
Fiterman Hall -3D West Broadway, New York, New York
Airtek Project 05-0867 — January 10, 2006
A site-specific Preliminary HASP to be applied to all site remediation and
deconstruction operations has been developed. The Preliminary HASP details
requirements for access/egress and requirements for Personal Protective
Equipment (PPE) for workers at the site. The Preliminary HASP is included as
Part III of the submittal package. The Contractor awarded the contract for the
Project will finalize the HASP as appropriate for the Contractor's operations.
2.5 Regulatory Submittal Part IV— Waste Sampling & Management Plan
A site-specific Waste Sampling & Management PIan (WSMP) to be applied to all
waste operations for the site has been developed. The WSMP provides details on
how, and by whom, waste determinations and categorizations will be made, and
provides detail on sampling and analysis protocols. The WSMP is included as
Part IV of the submittal package. A QAPP for the WSMP is included as
Attachment D to the WSMP.
3.0 Environmental Regulatory Notifications
3.1 Asbestos Survey
To comply with New York State Department of Labor (NYS DOL) requirements
for building demolition, Airtek has undertaken an asbestos survey intended to
coordinate and complete previous survey work that has been conducted at the site.
All previous documentation was reviewed and a site survey and bulk sampling
were conducted. Based on this survey work, an inventory of in-place asbestos has
been developed. The results of the survey are included in Appendix IV to the
Environmental Characterization Report.
3.2 NYS DOL Notification
The NYS DOL is the primary jurisdiction for the Remediation Phase of the
Project. As the remediation will constitute a `Large Project" according to
Industrial Code Rule 56 (ICR 56), notification of the Remediation Phase will be
made to the NYS Department of Labor.
3.3 NYS DOL Variance Applications
As required by the specifics of the Contractor's work plan, which is to be
provided in the subsequent regulatory submittal, NYS DOL Variances will be
solicited and will be included as Attachment Ito the final version of Regulatory
Submittal Part I - Work Plan.
3.4 NYC DEP Notification
Notification of the project will be made to the NYC DEP for the Remediation
Phase. Jurisdiction for work practices and variances is under the NYS DOL.
4
NYC-WTC 000096547
OCR can misread numbers and units. Confirm readings against the page image before using them.