Management plan document, 30 Warren Street, January 2006

Machine-extracted title · confidence 85%

Document cover page detailing management plans for remediation and deconstruction at the specified site.

NYC-WTC_000096544–000096566

Folder label: “201 WARREN STREET Block: 16 Lot: 220

Page image
Scanned page image, NYC-WTC_000096546
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Regulatory Submittal Part I — Work Plan Fiterman Hall — 30 West Broadway, New York, New York Airtek Project 05-0867 — January 10, 2006

1.0 General

A project team headed by Pei Cobb Freed & Partners, Architects, LLP (PCF-P) has been retained by the Dormitory Authority of the State of New York (DASNY), and The City University of New York (CUNY) to prepare a Project Plan to conduct the environmental remediation and deconstruction of the Fiterman Hall Building located at 30 West Broadway, New York, NY (Fiterman Hall, the Building, or 30 West Broadway). The Building is a 15-story, 370,000 (SF) classroom building owned by DASNY and operated prior to 9/1 l by CUNY/Borough of Manhattan Community College. The building was physically damaged by the collapse of 7 World Trade Center, and impacted by the environmental effects of the World Trade Center Collapse. The purpose of Regulatory Submittal Part I — Work Plan, is to provide an overview of the intended project approach to be considered and used in conjunction with the documents described in Section 2.0, following.

2.0 Related Documents

2.1 Facade Characterization Report

Airtek Environmental Corporation (Airtek) was retained by PCF-P, on behalf of DASNY/CUNY to conduct a characterization of the facade of the Fiterman Hall Building. This report was prepared to support specific project planning and execution decisions. The Facade Characterization Report is provided under separate cover.

2.2 Environmental Characterization Report

Airtek was retained by PCF-P on behalf of DASNY/CUNY to conduct an environmental characterization study of the Fiterman Hall Building. The Environmental Characterization Report is provided under separate cover.

23 Regulatory Submittal Part II — Environmental Community Air Monitoring Program

Prior to initiation of any decontaminationldeconstruction operations, an environmental community air monitoring program (ECAMP) approved by the USEPA, and detailed in the related document, Regulatory Submittal Part II- Environmental Community Aii Monitoring Program, will be established and operational. The Program will consist of daily air monitoring at four points on the perimeter of the project site. Community Monitoring will continue until building demolition is complete. A Quality Assurance Project Plan (QAPP) is included as Attachment D to the EQAMP.

2.4 Regulatory Submittal Part III — Preliminary Health & Safety Plan

NYC-WTC 000096546

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000096546Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →