NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 02/30 West Broadway
Document / 56 pages

Preliminary Environmental Assessment report, Jan 2006

Machine-extracted title · confidence 90%

Cover page for a Preliminary Environmental Assessment report dated January 10, 2006 for 30 West Street.

NYC-WTC_000095688–000095743

Folder label: “30 West Broadway

Page image
Scanned page image, NYC-WTC_000095690
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Environmental Characterization Report Fiterman He, 30 West Broadway, New York, NY Airtek Project #05-0867 — January 10, 2006

Introduction

Airtek Environmental Corp. (Airtek) has been retained by Pei Cobb Freed & Partners, Architects, LLP (PCFP) on behalf of the Dormitory Authority of the State of New York (DASNY) and The City University of New York (CUNY) to conduct an environmental characterization study of the Fiterman Hall Building located at 30 West Broadway, New York, NY (Fiterman Hall, the Building, or 30 West Broadway). The Building is a 15-story, 370,000 (SF) classroom building owned by CUNY and operated prior to 9/11 by CUNY/Borough of Manhattan Community College. For purposes of the environmental decontamination and deconstruction of Fiterman Hall, DASNY is acting as and for the Building owner. The Building was physically damaged by the collapse of the 7 World Trade Center building, and impacted by the well-documented environmental effects of the entire World Trade Center (WTC) collapse of September 11, 2001.

Based upon the extent of the facade damage, its location on the south side of the Building facing the WTC site, and the documented incursion of WTC dust and debris. DASNY/CUNY and the Regulatory community have jointly concluded that the Building is contaminated and requires extensive environmental remediation prior to demolition. To ensure that this work is conducted in a manner that maximizes the protection of human health and the environment, project planning is based on the conservative assumption that the entire structure is contaminated.

This investigation was focused on environmental conditions within Fiterman Hall as they relate to the planning and specification of the environmental remediation and subsequent deconstruction of the structure (the Project). The investigation included review of data and observations recorded by previous environmental investigations conducted both prior and subsequent to the WTC collapse. The investigation also included focused site environmental investigations and testing designed to provide specific information germane to the remediation and deconstruction of Fiterman Hall.

1.0 Executive Summary:

The decision to approach the project on the assumption that the entire Building is contaminated obviated the

3

NYC-WTC 000095690

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000095690Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →