Permit application Part I, remediation Jan 2006

Machine-extracted title · confidence 90%

Part I of a permit application dated January 10, 2006 for the remediation and deconstruction at 30 West Street.

NYC-WTC_000095744–000095765

Folder label: “30 West Broadway

Page image
Scanned page image, NYC-WTC_000095747
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Regulatory Submittal Part I — Work Plan Fiterman Hall — 30 West Broadway, New York, New York Airtek Project 05-0867 — January l0, 2006

A site-specific Preliminary HASP to be applied to all site remediation and deconstruction operations has been developed. The Preliminary HASP details requirements for access/egress and requirements for Personal Protective Equipment (PPE) for workers at the site. The Preliminary HASP is included as Part III of the submittal package. The Contractor awarded the contract for the Project will finalize the HASP as appropriate for the Contractor's operations.

2.5 Regulatory Submittal Part IV— Waste Sampling & Management Plan

A site-specific Waste Sampling & Management Plan (WSMP) to be applied to all waste operations for the site has been developed. The WSMP provides details on how, and by whom, waste determinations and categorizations will be made, and provides detail on sampling and analysis protocols. The WSMP is included as Part IV of the submittal package. A QAPP for the WSMP is included as Attachment D to the WSMP.

3.0 Environmental Regulatory Notifications

3.1 Asbestos Survey

To comply with New York State Department of Labor (NYS DOL) requirements for building demolition, Airtek has undertaken an asbestos survey intended to coordinate and complete previous survey work that has been conducted at the site. All previous documentation was reviewed and a site survey and bulk sampling were conducted. Based on this survey work, an inventory of in-place asbestos has been developed. The results of the survey are included in Appendix IV to the Environmental Characterization Report.

3.2 NYS DOL Notification

The NYS DOL is the primary jurisdiction for the Remediation Phase of the Project. As the remediation will constitute a 'Large Project" according to Industrial Code Rule 56 (ICR 56), notification of the Remediation Phase will be made to the NYS Department of Labor.

3.3 NYS DOL Variance Applications

As required by the specifics of the Contractor's work plan, which is to be provided in the subsequent regulatory submittal, NYS DOL Variances will be solicited and will be included as Attachment Ito the final version of Regulatory Submittal Part I - Work Plan.

3.4 NYC DEP Notification

Notification of the project will be made to the NYC DEP for the Remediation Phase. Jurisdiction for work practices and variances is under the NYS DOL.

4

NYC-WTC 000095747

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000095747Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →