NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 02/30 West Broadway
Document / 22 pages

Permit application Part I, remediation Jan 2006

Machine-extracted title · confidence 90%

Part I of a permit application dated January 10, 2006 for the remediation and deconstruction at 30 West Street.

NYC-WTC_000095744–000095765

Folder label: “30 West Broadway

Page image
Scanned page image, NYC-WTC_000095748
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Regulatory Submittal Part I — Work Plan Fiterman Hall — 30 West Broadway, New York, New York Airtek Project 05-0867 —January 10, 2006

3.5 USEPA Notification

Due the fact that the decontamination will constitute a Large Asbestos Project" according to EPA NESHAP, notification of the project will be made to the USEPA. A copy of the USEPA notification will be attached to the final version of the Project Work Plan. In addition, if it is determined that greater than 100 kg of Hazardous Waste is to be generated in any one month from this site, RCRA notification of USEPA will be required.

4.0 Utilities - General:

4.1 Electric

The building is presently fed with a temporary service consisting of 800 Amps, 120 / 208 VAC electric power off of a Con Edison meter located in a protective enclosure and shed situated at the northwest corner of the site. The power presently feeds a switch providing emergency power for emergency lighting, a single service elevator, and temporary light stringers. This current electrical service is insufficient for the needs of the remediation / deconstruction Contractor; therefore, additional power must be provided.

The mechanical engineering consultant assessed the projected electrical loads, and prepared drawings showing the scope of the required electrical work. Con Edison reviewed the load request and the drawings, and determined that its equipment located in a vault on Barclay Street can adequately meet this requirement. The Construction Manager will contract with a licensed electrical contractor for the reactivation of a portion of the original building system.

Con Edison recently inspected the transformer installation located in vaults on Barclay Street that originally fed the building, and determined that one of the three transformers in the vault is currently active and the remaining two can be reactivated. Prior to increasing the power to the building, Con Edison requires that the existing inactive electrical equipment be cleaned of dust and rust, and then tested by the licensed electrical contractor. This work is to be conducted under a re-opening of NYS DOL Variance 05-0919. Con Edison will then inspect the electrical equipment. Once accepted, Con Edison will direct the electrical contractor to disconnect the temporary service. Con Edison will then reactivate the additional transformers.

The licensed electrical contractor will activate power in the main building riser to the main distribution panel on each floor. All distribution throughout the floor will be inactive. Power to the passenger and freight elevator will be restored. The elevator equipment will be gross cleaned and restored to operation by a licensed elevator maintenance contractor.

NYC-WTC 000095748

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000095748Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →