NYC 9/11 Public Portal Document
Regulatory Submittal Part III — Health & Safety Plan
Fiterman Hall — 30 West Broadway, New York, New York
Airtek Project 05-0867 — January 10, 2006
Attachment 3
Worker Hygiene and Protection
Work clothes include tyvek full body work clothing, gloves, hardhats, disposable shoe coverlets, safety vests
and vented goggles. These items will be provided as required and laundered according to the requirements
of 29 CFR 1926.62.
Employees will be required to observe the following procedures:
1. Change into work clothing and shoe covers in the designated area.
2. Use work garments and appropriate protective gear including respirators before entering the work
area; and
3. Store any clothing not worn under protective clothing in the designated area.
When leaving the work area, employees will:
HEPA vacuum all contaminated protective work clothing while it is still being worn. Worker Hygiene and
Protection
In addition to the engineering controls previously mentioned, Airtek Environmental Corporation will
provide the necessary personal protective clothing and equipment to potentially exposed employees. Work
clothes include tyvek full body work clothing, gloves, hardhats, disposable shoe coverlets, safety vests and
vented goggles. These items will be provided as required and laundered according to the requirements of 29
CFR 1926.62.
Employees will be required to observe the following procedures:
4. Change into work clothing and shoe covers in the designated area.
5. Use work garments and appropriate protective gear including respirators before entering the work
area; and
6. Store any clothing not worn under protective clothing in the designated area.
When leaving the work area, employees will:
1. HEPA vacuum all contaminated protective work clothing while it is still being worn. At no time
may lead be removed from protective clothing by any means which results in uncontrolled dispersal
of lead.
2. Remove shoe covers (these must not be left in work area). Work area must be left clean before lunch
and at end of the day.
3. Remove protective clothing and gear in the controlled section of the designated changing area.
Remove protective coveralls by carefully rolling down the garment to reduce exposure to dust.
4. Remove respirator last.
In addition to the procedures described above, employees will obey the following procedures at all sites:
1. Place all disposal coveralls and shoe covers with the abatement waste.