Part III of a permit application dated January 10, 2006 regarding health and safety for remediation at 30 West Street.

NYC-WTC_000095781–000095833

Folder label: “30 West Broadway

Page image
Scanned page image, NYC-WTC_000095829
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Regulatory Submittal Part III — Health & Safety Plan Fiterman Hall — 30 West Broadway, New York, New York Airtek Project 05-0867 — January 10, 2006

Attachment 3

Worker Hygiene and Protection

Work clothes include tyvek full body work clothing, gloves, hardhats, disposable shoe coverlets, safety vests and vented goggles. These items will be provided as required and laundered according to the requirements of 29 CFR 1926.62.

Employees will be required to observe the following procedures: 1. Change into work clothing and shoe covers in the designated area. 2. Use work garments and appropriate protective gear including respirators before entering the work area; and 3. Store any clothing not worn under protective clothing in the designated area.

When leaving the work area, employees will: HEPA vacuum all contaminated protective work clothing while it is still being worn. Worker Hygiene and Protection

In addition to the engineering controls previously mentioned, Airtek Environmental Corporation will provide the necessary personal protective clothing and equipment to potentially exposed employees. Work clothes include tyvek full body work clothing, gloves, hardhats, disposable shoe coverlets, safety vests and vented goggles. These items will be provided as required and laundered according to the requirements of 29 CFR 1926.62.

Employees will be required to observe the following procedures: 4. Change into work clothing and shoe covers in the designated area. 5. Use work garments and appropriate protective gear including respirators before entering the work area; and 6. Store any clothing not worn under protective clothing in the designated area.

When leaving the work area, employees will: 1. HEPA vacuum all contaminated protective work clothing while it is still being worn. At no time may lead be removed from protective clothing by any means which results in uncontrolled dispersal of lead. 2. Remove shoe covers (these must not be left in work area). Work area must be left clean before lunch and at end of the day. 3. Remove protective clothing and gear in the controlled section of the designated changing area. Remove protective coveralls by carefully rolling down the garment to reduce exposure to dust. 4. Remove respirator last.

In addition to the procedures described above, employees will obey the following procedures at all sites: 1. Place all disposal coveralls and shoe covers with the abatement waste.

49

NYC-WTC 000095829

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000095829Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000165900 · Box 7DDC

Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.

Cited alongside this record in an Ask answer

Compare copies and versions →