NYC 9/11 Public Portal Document
City Environmental Quality Review
ENVIRONMENTAL ASSESSMENT STATEMENT
PART I, GENERAL INFORMATION
Reference 1.
CEQR REFERENCE NUMBER (TO BE ASSIGNED BY LEAD AGENCY) BSA REFERENCE NO. IF APPLICABLE
Numbers
ULURP REFERENCE NO. IF APPLICABLE OTHER REFERENCE NO. (S) IF APPLICABLE
(e.g., Legislative Intro, CAPA, etc.)
Lead 2a. LEAD AGENCY 2b. APPLICANT INFORMATION
Agency & Dormitory Authority State of New York City University of New York.
NAME OF LEAD AGENCY NAME OF APPLICANT
Applicant
Information Jack D. Homkow, Director Eduardo Del Valle
PROVIDE APPLICABLE NAME OF LEAD AGENCY CONTACT PERSON NAME OF APPLICANT'S REPRESENTATIVE OR CONTACT
INFORMATION PERSON
Office of Environmental Affairs Department of Design, Construction &
One Penn Plaza, 52nd Fl. Management
555 W. 57th St. 10th Floor
ADDRESS ADDRESS
New York NY 10119-0098 New York NY 10019
CITY STATE ZIP CITY STATE ZIP
212-273-5033 212-273-5121 212-541-0468 212-541-0168
TELEPHONE FAX TELEPHONE FAX
ihomkow(a dasny.org Eduardo.delValle(a~mail.cuny.edu
EMAIL ADDRESS EMAIL ADDRESS
Action 3a. NAME OF PROPOSAL Fiterman Hall Decontamination and Deconstruction
DESCRIBE THE ACTION(S) AND APPROVAL(S) BEING SOUGHT FROM OR UNDERTAKEN BY CITY (AND IF APPLICABLE, STATE AND FEDERAL
Description 3b. AGENCIES) AND, BRIEFLY, DESCRIBE THE DEVELOPMENT OR PROJECT THAT WOULD RESULT FROM THE PROPOSED ACTION(S) AND
APPROVAL(S):
SEE CEQR MANUAL
SECTIONS 2A & 2B
On behalf of the City University of New York (CUNY), the Dormitory Authority State of New York
(DASNY) proposes to decontaminate and deconstruct Fiterman Hall in Lower Manhattan. The 16-story,
steel-frame and concrete-slab building was irreparably damaged and infiltrated with contaminants on
September 11, 2001, when 7 World Trade Center collapsed and struck the south facade. The impact led to
the partial collapse of the southwest corner of the structure. The proposed action would include
decontamination of the interior and exterior of the building, removal and disposal of building contents, and
deconstruction of the existing, approximately 377,000-gross-square-foot structure. All decontamination and
deconstruction activities would be conducted in accordance with the provisions of the project's
Decontamination and Deconstruction Plan, which will be submitted to the U.S. Environmental Protection
Agency for review and approval prior to the commencement of work. Preliminary planning is underway for
a replacement building. When a proposal for the replacement building has been more fully developed it will
be subject to an environmental review under the State Environmental Quality Review Act (SEQRA).
DESCRIBE THE PURPOSE OF AND NEED FOR THE ACTION(S) AND APPROVAL(S):
3c.
The decontamination and deconstruction of Fiterman Hall is necessary because the building was
contaminated and structurally compromised beyond repair by the events of September 11, 2001.
As a result, Fiterman Hall is not habitable and cannot be restored to its former use.
Required H CITY PLANNING COMMISSION 0 Yes p No
Action or ❑ Change in City Map ❑ Zoning Certification ❑ Site Selection — Public Facility
Approvals - El Zoning Map Amendment ❑ Zoning Authorization 0 Disposition — Real Property
❑ Zoning Text Amendment ❑ Housing Plan & Project ❑ UDAAP El Revocable Consent ❑ Concession
❑ Charter 197-a Plan
❑ Zoning Special Permit, specify type:
❑ Modification of:
❑ Renewal of:
Other:
/UNIFORM LAND USE PROCEDURE (ULURP) ❑ Yes ❑O No
r
1