NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 01/20 JOHN STREET 1001104, 65/22
Document / 1 page

WTC site personnel sign-in sheet

Machine-extracted title · confidence 80%

Site access and personnel record sheet for World Trade Center environmental remediation project documenting contractor staff, badge assignments, and work site access.

NYC-WTC_000094348

Folder label: “20 JOHN STREET 1001104, 65/22

Page image
Scanned page image, NYC-WTC_000094348
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document • • • Asbestos Inspection Report Premise No. Floor ROOF É FACADE 20 JOHN Zip 10038 Inspector Dennis Antzoulatos STREET Borough 1 Building Type COMMERCIAL Contractor's Name Benjamin Kurzban & Son Control Address City 1248 Ralph Avenue, Brooklyn State Zip Phone NY 11236 (718)531-2900 • Laboratory Name Warren & Panzer Engineers Inc. Address City 228 East 45 Street New York State Zip Phone NY 10017 (212) 922-0077 Contact Person Block 65 Inspection Date: As NOTED Lot Squad # Badge # 22 N/A Basis of Inspection WTC Survey A020 Photos Taken (Yes/ No Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name Address City State Zip Phone Time of Inspection from: As NOTED SUNDAY OCTOBER 6 2002 (0600AM-1100AM) THE CUEAN UP OF THE NORTH FACADE OF THE PREMISE WAS CONDUCTED TODAY. A PLASTO DUKE WAS CONSTRUCTED TO COLECT RUN OFF WATER. A DECONTAMINATION TRUCK LiAS UTILZED FOR WORRER DECON- TAMINATION. AlR SAMPUNG WAS PERFORMED BU CHETRAM RAMRAS (CERTIEICATE AH 98-198A2 EXP 01/03) OF WARREN & PANZER. THE AL SAMPLES WERE RUN ON THE OPPOSITE SIDELALK. AT THE CONCLUSION OF THE CLEAN UP ACTIVITIES I CONDUCTED A VISUAL INSPECTION OF THE CHANED JURFACES AND OBSERNED NO VISIBLE WTC DEBRIS. THURSDAY OCTOBER 10 2002 (0800AM- 0800PM) THE CIEAN UP OF THE PEAR FACADE (SOUTH FACADE) WAS CONDUCTED TODAY. AIR SAMPUNG WAS PERTORMED BY FESTY OSEMWEGIE OF WARREN & PANZER (CERTFICATE # AH 01-01030 ERP 01/03). THE AlR SAMPLS wERE PUN ON THE ROOF OF 1B JOUN STREET. THURSDAY OCTOBER 11 2002 (08COAM- OB00PM) THE CUEAN UP OF THE ROCSE OF THE PREMISE WAS CONDUCTED TODAY ALR SAMFUNG FOR THIS PORTION OF THE CUEAN UP PROSECT WAS PERFORMED BY IDRIS IDOUM (CERTIFICATE # AM-OZ 11201 EXP 05/05). UPON COMPLETION OF THE CLEAN UP ACTIVITIES I CONDUCTED A VISUAL lNSPECTION OF THE CUEANED SURFACES AND I OESERNED NO VISIBLE LUTE DEBRIS. THE CEAN UP PROECT AT THE PREMISE IS NOUS COMPLETE. NOTE: THE CUEAN UP OF THE NORTH FACADE OF ZOSCHN ST & THE CUEANUP OF THE NORTH FACADE Of 18 SOHN ST OCCURRED SIMULTANEDUSUY. FOR THE PURPOSES OF AIR MONITORING, THE FACADES OF THESE TWO BUILDINES WEDE TREATED AI DUE WORK APEA. Re NYC-WTC_000094348

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000094348Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →