NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 01/15 JOHN STREET 1001217, 79/14
Document / 1 page

Execution page for exterior debris removal license, Jul 2002

Machine-extracted title · confidence 90%

Final signature page of the license agreement executed by the City and building owner to authorize cleanup work.

NYC-WTC_000094284

Folder label: “15 JOHN STREET 1001217, 79/14

Page image
Scanned page image, NYC-WTC_000094284
OCR text

OCR status: ocr · source: ours

NYC 9/11 Public Portal Document Asbestos Inspection Report • Premise No. 15 JOHN STREET RODF F000 AND FACADES Zip 10038 Borough 1 Inspector Building Type Dennis Antzoulatos Contractor's Name COMMERCIAL Benjamin Kurzban & Son Control Address City 1248 Ralph Avenue, Brooklyn State Zip Phone NY 11236 (718)531-2900 Laboratory Name Warren & Panzer Engineers Inc. Address City 228 East 45 Street New York State NY Zip Phone 10017 (212) 922-0077 Contact Person Block 79 Inspection Date As NOTET Squad# Badge # N/A A020 Basis of Inspection Photos Taken WTC Survey Yes/ No Sample Number N/A Sample Number N/A Sample Number N/A Owner's Name Address City State Zip Phone Time of Inspection from: AS NOTED MONDAY AUEUST 5. 2002 (100 AM TO 300 PM) SCAFFOLDING CONTRACTOR BRINGS EQUIPMENT TO THE JOBSITE. TUESDAY AUGUST 6, 2002 (800 AM TO 600PM) THE HANGING SCAFFOLD IS ERECTED AND THE VACUUMING OF BULK DEBRIS FROM THE WEST FACADE OF THE BUILDING IS BEGUN. AlR MONITORING FOR THIS PORTION OF THE WORK IS PERFORMED BY LUIS SOTO (CERTIFICATE dE AH 0O-20894 EXP 03/03): WEDNESDAY AUGUST T 2002 (800 AM TO 600PM) VACUUMING OF THE IST DROP (OF 3) OF THE CEST FACADE HAS BEEN COMPLETED. POWEI WASHINE ACTIVITIES FEGIN ON THE IST DROP PORTION DF THE WEST FACADE. ALR SAMPLING PERFORMED R4 LUIS SOTO OF WARREN & PANZER. THURSDAY AUGUSI 8 2002 (800AM TO 600PM) VACUUMING OF THE ZND OROP (OF 3) OF THE WESI FACADE IS CONDUCTED. POWER UASHINGI ACTIVITIES COMMENCE AFTER BULK MATERIAL MAS BEEN VACELMED. Ale SAMPUNG IS PERFORMED By LUIS SOID OF WARREN & PANZER ENGINEFES. THE VACUUMING OF BULK DEBRIS FROM THE WINDOL LEDGES OF THE EAST FACADE OCEUES SIMUTANEOUSLY. THE INSIDE OF THE BUILDING (BUILDINGI IS VACANT]. FRIDAY AUGUST O 2002 (8O0AMTO 600 PMJ THE CUEAN UP OF THE 3RD DROP OF THE WEST FACADE AND THE CUEAN UP OF THE NORTH FACADE ADE CONDUCTED TODAY. A VISUAL INSPECTION OF THE CLEANED FACADE SURFACES IS CONDUCTED AND NO VISIBLE WTC DEBRIS IS OBSERNED. THE SOUTH FACADE (SOHN STREET ) CLEAN UP IS SCHEDULED FOR SUNDAY NYC-WTC_000094284

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000094284Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

WTC site personnel sign-in sheet · Box DEP Box 01

NYC-WTC_000094348

Site access and personnel record sheet for World Trade Center environmental remediation project documenting contractor staff, badge assignments, and work site access.

4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.973

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →