EPA interim final report on WTC background study, April 2003 — page 46
Summary Interim final report from EPA Region 2 detailing a background study of environmental conditions at the World Trade Center site.
’^ llliiiil Asbestos - TEM 0.
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”. Semantic ranking is unavailable (ollama http 502); showing keyword-only results.
Summary Interim final report from EPA Region 2 detailing a background study of environmental conditions at the World Trade Center site.
’^ llliiiil Asbestos - TEM 0.
Summary Notice instructing staff to preserve original World Trade Center documents for potential legal actions against the City.
Update on Daily Report Regarding Hazmat Activities and Asbestos Air Sampling: • Results of Air Testing at City Hall: All asbestos wipes taken following the clean up at City Hall
Summary Notice instructing staff to preserve original World Trade Center documents for potential legal actions against the City.
Update on Daily Report Regarding Hazmat Activities and Asbestos Air Sampling: • Results of Air Testing at City Hall: All asbestos wipes taken following the clean up at City Hall
Summary Forwarded internal memo providing guidance to DEP staff regarding building reopening south of 14th Street.
professionals (i.e., R.A.s, P.E.s, Asbestos Inspectors, etc.)
Summary Table of contents for a site control plan document regarding landfill entry and exclusion zones for WTC debris.
FBI/Public Health- • Personal exposure monitoring for airborne asbestos on workers in the building seven area.
Summary Review draft of an environmental health and safety plan for debris operations at Staten Island Landfill.
FBI/Public Health- • Personal exposure monitoring for airborne asbestos on workers in the building seven area.
Summary Official letter declaring an emergency to facilitate procurement under city rules for a WTC-related roof removal contract.
The lowest bid, $955,650, was submitted by Trio Asbestos Removal Corp. (“Trio”).
Summary Memorandum providing a timeline of DEP's initial response and coordinated street cleanup efforts at the World Trade Center site.
The landlord was verbally ordered to conduct on asbestos cleanup and he complied. NYC-WTC_000151419
Summary Draft protocol establishing procedures for evaluating airborne and settled dust in residential and commercial areas near the World Trade Center.
I/O dust PLM, and if <1% TEM asbestos, gypsum, I/O dust XRD mica, fiberglass calcite * LOD:Limit of analytical detection; LOQ: Limit of analytical quantitation
Summary Draft memorandum providing a timeline of Department of Environmental Protection actions taken during the initial World Trade Center response and cleanup.
The landlord was verbally ordered to conduct on asbestos cleanup and he complied. NYC-WTC_000153124
Summary Lab report detailing asbestos sampling results from five locations (one per borough) as of September 14, 2001, with most results below residential reoccupancy thresholds.
Y ,1 - z As of 9/14/01, asbestos sampling was set up at five locations, one in each of the boroughs.
Summary Draft protocol for assessing airborne and settled dust exposures in residential areas following the World Trade Center collapse.
I/O dust PLM, and if <1% TEM asbestos, gypsum, I/O dust XRD mica, fiberglass calcite * LOD:Limit of analytical detection; LOQ: Limit of analytical quantitation
Summary Letter from a complainant regarding improper asbestos cleanup at 333 [name] and requesting reinvestigation of test results.
Enclosed is a copy of the complaint with the test results indicating the presence of asbestos a 333 Rector Place in excess of 1%.
Summary Document listing examples of World Trade Center evidence and areas of focus for preservation efforts.
To date inquiries are M O” Daily Report Regarding Hazmat Activities and Asbestos Air Sampling: • ReSlilts of Air Testing at City Hall: All asbestos wipes taken
Summary Page from a laboratory report containing only formatting characters and no readable content.
Update on Daily Report Regarding Hazmat Activities and Asbestos Air Sampling: • Results of Air Testing at City Hall: All asbestos wipes taken following the clean-up
The landlord was verbally ordered to conduct an asbestos cleanup and..... complied.
I/O dust PLM, and if <1% TEM asbestos, gypsum, I/O dust XRD mica, fiberglass calcite * LOD:Limit of analytical detection; LOQ: Limit of analytical quantitation
Summary Interoffice memo submitting previously requested air monitoring and water test results to DEP Director.
The purpose of the investigation was to identify and quantity suspect debris and debris that may contain asbestos.
Summary Interoffice memo submitting previously requested air monitoring and water test results to DEP Director.
The purpose of the investigation was to identify and quantify suspect debris and debris that may contain asbestos.
Summary Letter from NYLS Director enclosing ambient air sampling data for post-9/11 environmental assessment.
NSD: No Asbestos Structures Detected * NVLAP#: 200546-0 isso 06 0.0041 00. 0D) dG?