NYC 9/11 Public Portal Document
'H CI9
Cowdagg ap7k we $NNW, lot.
February 25, 2002
Mr. Bahram Zadeh
Engineering Department
CLUB QUARTERS
52 William Street
New York, NY 10005
RE: ASBESTOS INVESTIGATION PERFORMED AT: 52 WILLIAM STRE
STAIRWELL ROOF & ELEVATOR MER ROOF, NEW ORK, NEW YORK
PROJECT ONY-079-02
Dear Mr. Zadeh:
On February 22 d. 2002, CTSI performed an asbestos investigation at the above referenced
premises. New York City and State licensed inspector conducted the investigation.
The purpose of the investigation was to identify and quantity suspect debris and debris that may
contain asbestos. An independent licensed laboratory (EMSL) using Polarized Light Microscopy
(PLM) methods analyzed all samples collected.
Five (5) bulk samples was collected from homogeneous dust and debris located on roofs
surfaces and inside gutters. Based on sample analysis the materials arc non-ACM.
Also, enclosed please find Bulk Sample Analysis PLM bulk sample certificate of analysis.
If you have any questions or need further information, please do not hesitate to contact
our office.
Sincerely,
CONSULTING & TESTING SERVICES, INC.
Farhood Salami
Vice President
NYC Asbestos Investigator License # 84243
Encl.
:aos, e y..,roaow„n,
0 622 Gevrgr Road, Suits 301
North Drummed 1'J 08901
EviroiimmsaI Sefrty @1 Xeslth Plsfusinwatr Tet (212) 929..3451 or (732) 729.1800
IFax: (732) 729.1803
www.easifler.eom
Z d Lt188£OZ£9'ON/Z£:£ '1S/££:£ ZOOZ 9Z 833(3^1) woad
NYC-WTC 000131002
OCR can misread numbers and units. Confirm readings against the page image before using them.