E-mails 2002 M. Gilsenan — page 3
The EPA plan would permit individuals to clean up asbestos contaminated dust by themselves, with EPA advice.
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”.
The EPA plan would permit individuals to clean up asbestos contaminated dust by themselves, with EPA advice.
Summary Fax cover sheet from the NYC Department of Environmental Protection Public Affairs Bureau dated August 7, 2002.
And now, only because parents independently paid for the tests, has asbestos been found.
Summary A project proposal outlining the timeline, methods, and justification for cleaning HVAC systems in residential units affected by World Trade Center dust.
Asbestos - Clean up all the surface including floors, walls, tabletops and all other horizontal surfaces.
Summary A project proposal outlining the timeline, methods, and justification for cleaning HVAC systems in residential units affected by World Trade Center dust.
Asbestos - Clean up all the surface including floors, walls, tabletops and all other horizontal surfaces.
Summary A project proposal outlining the timeline, methods, and justification for cleaning HVAC systems in residential units affected by World Trade Center dust.
Asbestos - Clean up all the surface including floors, walls, tabletops and all other horizontal surfaces.
Summary DEP internal communication about failed reinspection attempts at an unoccupied apartment in Building 11 and proposed revisions to documentation notes.
Vincent Coluccio <vcolucci@health To: Mary Mears/R2/USEPA/US@EPA .nyc.gov> cc: Subject: Fwd: Residential Asbestos Sampling Results;
Summary Proposed EPA/FEMA inter-agency agreement with data analysis and validation costs for dioxin, metals, and asbestos monitoring.
the estimates for asbestos analysis.)
Summary EPA proposes increased data analysis and validation costs for dioxin and metals monitoring in WTC cleanup.
for asbestos analysis.)
Summary Draft record containing tabulated data regarding asbestos sampling or analysis at the World Trade Center recovery site.
Under normal use the receptor population is assumed to be exposed to airborne asbestos fibers while driving and while periodically cleaning the interior of the vehicle.
Summary Draft record containing tabulated data regarding asbestos sampling or analysis at the World Trade Center recovery site.
Table 2 presents the estimated total cancer risks for the Commuter receptor scenario for exposure to asbestos in air.
Summary Request to the Department of Transportation for a fee waiver regarding sidewalk closures needed for exterior debris cleaning operations near the WTC site.
Trio Asbestos Removal Corp.
Summary Interdepartmental correspondence discussing failed DEP attempts to access and reinspect an unoccupied apartment, documenting denial of access and landlord-reported cleaning prior…
Vincent Coluccio <vcolucci@health To: Mary Mears/R2/USEPA/US@EPA .nyc.gov> cc: Subject: Fwd: Residential Asbestos Sampling Results;
Summary EPA Region II letter confirming that primary and secondary clearance levels for asbestos and other contaminants were met at 114 Liberty Street.
Your staff has identified the area of the building that contains the pizza shop as having asbestos-containing material (ACM).
Summary Joint OSHA and Bechtel crane inspection report analyzing safety conditions at the World Trade Center site.
NYC 9/11 Public Portal Document OSHA SAMPLING RESULTS SUMMARY AS OF 3/11/02 Asbestos: A total of 1136 samples (excluding bulk and blank samples) for asbestos have
Summary DEP correspondence to Corporation Counsel establishing an emergency contract for cleanup and removal of material near the WTC site.
In order to enable to opening of streets and buildings below 14th Street, such asbestos remediation was required at a specific fi-equency for several
Summary Letter from DEP to DOT requesting fee waivers for sidewalk closures during exterior debris removal.
Trio Asbestos Removal Corp.
Summary A chain of custody cover sheet for air monitoring samples sent to the EPA Region 1 laboratory in January 2003.
NYC 9/11 Public Portal Document ASBESTOS and OTHER FIBERS by PCM: METHOD 7400, Issue 2, dated 15 August 1994 - Page 14 of 15 These rules are sometimes referred to as the "A" rules
Summary Interim final report from EPA Region 2 detailing a background study of environmental conditions at the World Trade Center site.
Residential Building Average Indoor Airborne Asbestos Concentrations for Asbestos Fibers ’ 5 mm Long by Direct Transmission Electron Microscopy
Summary Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
reguired building owners to comply with the reguirements of Title 15, Chapter 1 of the rules of the City of New York, including notification of asbestos
Summary Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
Corona, NY 11368 (718)DEP-HELP Fax (718)595-4096 Roport Date 07/03/2003 10:49 AM Submitted By Sorvice # 357634 Problem B1 ASBESTOS COMPLAINT Address 7 WORLD TRADE CENTER Cross Streets VESEY ST VESEY ST Compass Direction Bullding