E-mails 2002 M. Gilsenan — page 1
Looks like we lost the battle again with EPA on the porous surfaces asbestos sampling. I don't think they understand the door they are opening by doing this. But they may need to learn the hard way.
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”.
Looks like we lost the battle again with EPA on the porous surfaces asbestos sampling. I don't think they understand the door they are opening by doing this. But they may need to learn the hard way.
by EPA, for total dust and 7 COPCs: dioxins, lead, PAHs, ceramic fibers, fibrous glass, asbestos
Pre-, post- and during EPA $462,000 Support Team cleaning sampling to be Contractor performed for 7 COPCs: asbestos
asbestos _____ asbestos
DEP has been monitoring the outside ambient air for asbestos levels at the entrances to Stuyvesant High School, PS/IS 89, PS 234 and the High School of Economics and Finance.
Summary Summary of calls received on Monday and details regarding the temporary setup of a voicemail box for the hotline.
that an expedited clean-up ofapproximately 250 debris-containing buildings is necessary to protect the health and safety of the public; and WHEREAS, such clean-up will require the services of asbestos-remediation
Summary Invitation to a multi-agency meeting to review the EPA-led residential cleaning plan for Lower Manhattan residents.
Based on the information and test results I have seen, asbestos is only one of several contaminants. Therefore, any program that only addresses asbestos in the testing and remediation of apartments is problematic.
Summary Draft screening levels for asbestos, fiberglass and silica in indoor air and settled dust.
Fritz Cc: [email protected]; [email protected]; [email protected] Subject: draft screening levels for asbestos, FG and silica in indoor air and settled dust Importance: High
Summary EPA communication distributed to federal and NYC agencies regarding post-9/11 environmental response coordination.
Results of air sampling by DEP and others indicates that WTC debris does not tend to aerosolize and is not a significant source of airborne asbestos fibers.
Summary DOH inquiry to DEP about EPA scope of work document and required addendum regarding ACM presumption language.
For large asbestos clean-up projects, a partial decontamination system (changing room and shower) shall be required at an entry/exit from each work area.
Summary EPA communication to federal and NYC agencies regarding post-9/11 environmental response.
For large asbestos clean-up projects, a partial decontamination system (changing room and shower) shall be required at an entry/exit from each work area.
For large asbestos clean-up projects, a partial decontamination system (changing room and shower) shall be required at an entry/exit from each work area.
Result indicates the sample was not asbestos containing material (ACM).
Summary Discussion on the implications of a bulk test result exceeding one percent asbestos in an unoccupied apartment.
Also, I think it's important to understand, that individual letters with the asbestos results have already been provided to each building owner/manager and occupants of the residences tested.
Summary Official notice instructing staff to preserve original WTC documents for potential future legal proceedings.
From: Kelpin, Gerry [NYCDEP/QUEENS/GERALDINEK] Sent: Monday, January 14, 2002 1:41 PM To: Gilsenan, Michael Subject: Reducing Asbestos
To: Erdfarb, Stuart; Schiano, Frank 001 Cc: Gilsenan, Michael; Fenves, Carol 001; Resnick, Risa Subject: Declaration of Emergency - Asbestos
Summary Summary of finalized contracts for rooftop and facade remediation near WTC.
$1,352,337.50 5/15/2002 9/12/2002 ROF-REM2 Benjamin Kurzban & Son Control $1,594, .00 5/15/2002 9/12/2002 ROF-REM3 Trio Asbestos Removal Corp.
Summary Revised EPA/FEMA coordination matrix with updated cost estimates for 10,500 residential units and 3,000 common areas cleaning.
contractor services of EPA NYC $49,540,000 Estimate based on 10,500 Contract minimal dust accumulations under Scope units to be cleaned, and (Asbestos
Summary Transmission of EPA/NYC coordination matrix for WTC environmental response activities to FEMA and City health department.
contractor services of EPA NYC $49,540,1132 Estimate based on 10,500 Contract minimal dust accumulations under Scope units to be cleaned, and (Asbestos
Summary EPA-led inter-agency communication regarding World Trade Center environmental response coordination among federal, state, and local agencies.
Fruchtman, Greg; Roman, Gilbert; Soloki, Ahmad; Brutus, Emmanual; Gill, Brenda; Wyatt, Lisette Subject: Air Monitoring Tech Course Importance: High All Asbestos