114 LIBERTY 2 OF 2 — page 13
Monitors must have served as a third party project monitor on at least 25 asbestos abatement projects.
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”.
Monitors must have served as a third party project monitor on at least 25 asbestos abatement projects.
Summary Request for review of monitoring contractor specifications for air sampling, including sampling methodologies, limits of detection, and clearance criteria, with reference to prior…
Monitors must have served as a third party project monitor on at least 25 asbestos abatement projects.
Summary Form documenting the tracking and handling of environmental samples collected by the Department of Environmental Protection.
As presented in Table 14.0, air samples collected for asbestos and analyzed using PCMe accounted for the majority (82 percent) of the additional cleaning events.
Summary Correspondence regarding Schedule A forms and a draft scope of work for cleaning and air monitoring contracts at the site.
Monitors must have served as a third party project monitor on at least 25 asbestos abatement projects.
Monitors must have served as a third party project monitor on at least 25 asbestos abatement projects.
Monitors must have served as a third party project monitor on at least 25 asbestos abatement projects.
Summary Official correspondence confirming receipt of analytical test results for a residential building and outlining the joint cleanup program.
Included in the letter was reaffirmation of Asbestos Control Program staffs observations whereby pre-existing building materials were identified as having suspect asbestos-containing material (
Summary Official correspondence confirming receipt of analytical test results for a residential building and outlining the joint cleanup program.
Included in the letter was reaffirmation of Asbestos Control Program staffs observations whereby pre-existing building materials were identified as having suspect asbestos-containing material (
Monitors must have served as a third party project monitor on at least 25 asbestos abatement projects.
Monitors must have served as a third party project monitor on at least 25 asbestos abatement projects.
Summary US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
information on the asbestos survey conducted, please refer to the Airtek Asbestos o4 & cormmi C. Survey Report dated May 31, 2005 (Attached).
Summary Documentation tracking the collection and handling of samples during an air quality survey at the specified building.
The number of the asbestos structures and total sample volume are used to estimate the total asbestos structures in the air.
Summary Purchase order form from JLC Environmental Consultants dated March 19, 2003 for environmental testing services.
I hope future PAH analyses can use the appropriate reporting limit as it will result in data that can be compared to the health-based benchmark. 2) The asbestos data indicates that the reporting
Summary Fragmented page showing only the United States Environmental Protection Agency Region II letterhead without specific content or date.
This testing was for asbestos in air and was conducted to I a very conservative, low asbestos sensitivity level and health based benchmark. 1 % of the test
Summary Newspaper report discussing health concerns and mercury exposure tests among workers and residents near Ground Zero.
subject to EPA rules for asbestos cleanup. A pri- effects.
Summary Draft fact sheet from DOH and DEP addressing tenant concerns regarding asbestos fibers at 105 Duane Street.
Not surprisingly, asbestos became the priority substance to test for at 105 Duane.
Summary Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
saBOii Type Asbestos Detected Asbestos Detected 09/14/01 Vacuum 5 Not Analyzed
Summary Interim final report from EPA Region 2 detailing a background study of environmental conditions at the World Trade Center site.
Asbestos in public and commercial buildings: A literature review and synthesis of current knowledge. Report of the asbestos literature review panel.
Summary Letter reporting asbestos testing results for air and dust at Borough of Manhattan Community College in February 2002.
Table 2 Asbestos in Dust SamnlinR Sample No.
Monitors must have served as a third party project monitor on at least 25 asbestos abatement projects.