DEP Hard Copies (68 Boxes) / DEP Box 43 / E-mails 2002 M. Gilsenan
NYC-WTC_000162486Machine-extracted title Memo or letterSummary Memo summarizing June 27, 2002 LMDC subcommittee discussion of indoor air and exterior facade cleaning programs, including definitional issues and program clarifications.
Visible inspection of building is not sufficient to insure buildings exteriors, including windows, are free of asbestos.
What about other pollutants in dust and air - mercury, lead and dioxin where mentioned.
DEP Hard Copies (68 Boxes) / DEP Box 10 / NO INFO
NYC-WTC_000148987Machine-extracted title Lab reportSummary Table listing volatile organic compound (VOC) sampling sites and dates outside of Ground Zero from September 2001 to January 2002.
World Trade Center Screening Criteria
Contaminant Site Worker Resident
Inorganics
Asbestos
DEP Hard Copies (68 Boxes) / DEP Box 31 / 114 LIBERTY 1 OF 2
NYC-WTC_000155142 Chain of custodyParameter Clearance Level Note
Asbestos in air 0.0009 f/cc PCMe Primary clearance level
Lead in settled dust <25 pg/
DEP Hard Copies (68 Boxes) / DEP Box 31 / 114 LIBERTY 1 OF 2
NYC-WTC_000155153 Chain of custodyParameter Clearance Level Note
Asbestos in air 0.0009 f/cc PCMe Primary clearance level
Lead in settled dust <25 pg/
DEP Hard Copies (68 Boxes) / DEP Box 31 / 114 LIBERTY 2 OF 2
NYC-WTC_000155436Machine-extracted title Chain of custodySummary Technical correspondence addressing asbestos air sampling methodology and pump flow rate specifications.
Table 2: Clearance Criteria
Parameter Clearance Level Note
Asbestos in air 0.0009 flee PCMe Primary clearance level
DEP Hard Copies (68 Boxes) / DEP Box 33 / 1 NORTH END AVENUE Block: 16 Lot: 225 BIN: 1085502 4 River Terrace, 60 Vesey Street
NYC-WTC_000097748Machine-extracted title Memo or letterSummary Cover letter from Ambient Group Inc dated Nov 1, 2001, addressing additional environmental concerns and proposed monitoring.
I2n FLOOR
Water treatment consulting
O ® Asbestos
DEP Hard Copies (68 Boxes) / DEP Box 34 / 114 LIBERTY STREET 1001041, 52/7502
NYC-WTC_000100885Machine-extracted title Chain of custodySummary Permit document detailing the installation of a heavy-duty shed and facade repairs at 114 Liberty Street in May 2002.
Parameter Clearance Level Note
Asbestos in air 0.0009 f/cc PCMe Primary clearance level
Lead in settled dust <25
DEP Hard Copies (68 Boxes) / DEP Box 38 / 120 Liberty St / 125 Cedar St - MMU -
NYC-WTC_000107825Machine-extracted title Chain of custodySummary Document listing seven contractor companies authorized for asbestos removal and cleanup operations at the WTC site.
Parameter Clearance Level Note
Asbestos in air 0.0009 f/cc PCMe Primary clearance level
Lead in settled dust <25 ft2
DEP Hard Copies (68 Boxes) / DEP Box 38
NYC-WTC_000107371Machine-extracted title Chain of custodySummary Fragmented document page likely associated with World Trade Center environmental monitoring records from late 2001.
Parameter Clearance Level Note
Asbestos in air 0.0009 f/cc PCMe Primary clearance level
Lead in settled dust <25
DEP Hard Copies (68 Boxes) / DEP Box 31 / 125 CEDAR 1 OF 2
NYC-WTC_000156011Machine-extracted title Chain of custodySummary Internal communication confirming receipt of Department of Health mold assessment report for 125 Cedar.
Parameter Clearance Level Note
Asbestos in air 0.0009 free PCMe Primary clearance level
Lead in settled dust <25 pg/
DEP Hard Copies (68 Boxes) / DEP Box 31 / 125 CEDAR 1 OF 2
NYC-WTC_000156023Machine-extracted title Chain of custodySummary Document tracking the chain of custody for environmental samples collected at 125 Cedar Street on August 21, 2002.
Parameter Clearance Level Note
Asbestos in air 0.0009 flee PCMe Primary clearance level
Lead in settled dust <25 pg/tf
DEP Hard Copies (68 Boxes) / DEP Box 31 / 125 CEDAR 1 OF 2
NYC-WTC_000156054Machine-extracted title Chain of custodySummary Document tracking the chain of custody for environmental samples collected at 114 Liberty Street on August 22, 2002.
Parameter Clearance Level Note
Asbestos in air 0.0009 f/cc PCMe Primary clearance level
Lead in settled dust <25 pg
DEP Hard Copies (68 Boxes) / DEP Box 11 / DEP EXTERIOR CLEAN UP - Also See Building Lists #2
NYC-WTC_000150909Machine-extracted title Memo or letterSummary Summary of LMDC meeting discussing the exterior program scope, indoor air issues, and definitions of facade.
Visible inspection of building is not sufficient to insure buildings exteriors, including windows, are
free of asbestos.
DEP Hard Copies (68 Boxes) / DEP Box 38
NYC-WTC_000108808Machine-extracted title Chain of custodySummary A document listing seven licensed contractors authorized to perform clean-up and abatement work at the World Trade Center site.
Parameter Clearance Level Note
Asbestos in air 0.0009 f%cc PCMe Primary clearance level
Lead in settled dust <25
DEP Hard Copies (68 Boxes) / DEP Box 08 / NO INFO
NYC-WTC_000144937Machine-extracted title Memo or letterSummary Large volume technical report containing environmental data and analysis related to the World Trade Center disaster site cleanup.
EPA sampled debris from inside the Pentagon for asbestos, lead and
19
NYC-WTC_000144937
DEP Hard Copies (68 Boxes) / DEP Box 08 / NO INFO
NYC-WTC_000145350Machine-extracted title Permit applicationSummary Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
This complex mixture of building debris and combustion by-products contained
such ingredients as asbestos, lead, glass fibers, and concrete dust.
DEP Hard Copies (68 Boxes) / DEP Box 08 / NO INFO
NYC-WTC_000145515Machine-extracted title Permit applicationSummary Notice from NYC Law Department instructing staff to preserve World Trade Center documents for potential legal actions.
This complex mixture of building debris and combustion by-products contained
such ingredients as asbestos, lead, glass fibers, and concrete dust.
DEP Hard Copies (68 Boxes) / DEP Box 08 / INTERIM FINAL April 2003
NYC-WTC_000145913Machine-extracted title Chain of custodySummary Interim final report from EPA Region 2 detailing a background study of environmental conditions at the World Trade Center site.
The compounds of interest were asbestos, man-made vitreous fibers, lead, dioxin,
polycyclic aromatic hydrocarbons, and crystalline silica.
DEP Hard Copies (68 Boxes) / DEP Box 08 / INTERIM FINAL April 2003
NYC-WTC_000145993Machine-extracted title Chain of custodySummary Interim final report from EPA Region 2 detailing a background study of environmental conditions at the World Trade Center site.
Table 1
World Trade Center Screening Criteria
Contaminant I Site Worker Resident
Inorganics
Asbestos
DEP Hard Copies (68 Boxes) / DEP Box 05 / FEMA Equipment Requests Emergency Expenses
NYC-WTC_000141643Machine-extracted title Permit applicationSummary Map showing the condition of buildings at the World Trade Center site as of September 21, 2001.
Asbestos-containing materials and lead-based paint debris may
possibly be generated during demolition.