16 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗114 LIBERTY 1 OF 2
Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000155149–000155155
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
DRAFT 4. Sampling equipment shall be placed at representative locations and away from obstruction. Sampling cassette must be placed on a tripod and not taped to existing surfaces. All air sampling equipment shall be pre- and post- calibrated to insure accurate air sampling volumes.
The Air Sampling Technician shall perform clearance air sampling after the areas are free of dust accumulations as determined by the Project Monitor. All surfaces must be completely dry prior to the start of sampling. The HVAC systems shall be run for a minimum of 5-6 hours prior to clearance sampling. Clearance air sampling shall be performed at each apartment. Five samples shall be collected in each apartment and two samples shall be collected in each common space. The elevator shaft shall be cleared separately. Clearance air monitoring shall be performed after the completion of all clean up activities at the work site. Clearance air sampling shall be aggressive and performed in accordance with Title 15, Chapter 1 of the RCNY Section 1-43 (a)-(d).
6. Clearance air samples shall be collected in accordance with the procedures specified in the NIOSH 7400 Method. The flow rate for collection of air samples shall be at least 10 liters per minute and no more than 15 liters per minute. Air sampling cassettes must be monitored to ensure the filters do not develop dark spots that would indicate clogging. The minimum sampling volume is 3600 liters. If clogging develops, the cassette must be changed.
7. All clearance air samples and completed chain of custody forms must be transported to the laboratory immediately after sampling is completed.
Clearance Criteria
1. The following clearance levels have been established by the USEPA for clean up activities resulting from the collapse of the WTC.
Parameter Clearance Level Note Asbestos in air 0.0009 f/cc PCMe Primary clearance level Lead in settled dust <25 jtg/ft2 Primary clearance level Dioxin in settled dust <4ng/m Primary clearance level Fibrous glass in air <0.01 f/cc Secondary clearance level Crystalline silica in air 0.5tg/m3 Secondary clearance level PAHs in settled dust <0.3 mg/m2 Secondary clearance level Mercury between 1 and 2 mg/m2 Secondary clearance level
2. Cleaning shall not be considered compete unless the primary clearance levels are achieved. The apartment will be re-cleaned and retested if the primary clearance levels are not achieved. These clearance levels may be re-evaluated and revised if determined necessary based on field conditions and analytical limitations. Secondary clearance levels shall be considered in determining the need for additional cleanup, however failure to meet the secondary clearance levels does not automatically trigger the re-cleaning.
4 of 5
NYC-WTC 000155153
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
No available related records indexed in this group.
Filed elsewhere
NYC-WTC_000139389
DEP forwards inspection report for 125 Cedar Street along with NYC guidelines on fungal remediation.
15 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗16 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163449
Chain of custody form dated August 22, 2002, documenting transfer of samples or materials between DEP personnel.
15 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155138
Documentation of sample chain of custody procedures for the 114 Liberty Street site.
15 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000156050
Document tracking the chain of custody for environmental samples collected at 114 Liberty Street on August 22, 2002.
15 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139162
Correspondence regarding the finalization of a contractor scope of work for air monitoring at 125 Cedar Street.
14 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000156019
Document tracking the chain of custody for environmental samples collected at 125 Cedar Street on August 21, 2002.
14 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139168
Correspondence regarding the finalization of a contractor scope of work for air monitoring at 125 Cedar Street.
15 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗14 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163372
Request to send the air monitoring scope document to legal counsel and the sender due to computer access issues.
14 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗15 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000139389
DEP forwards inspection report for 125 Cedar Street along with NYC guidelines on fungal remediation.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100879
Permit document detailing the installation of a heavy-duty shed and facade repairs at 114 Liberty Street in May 2002.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163449
Chain of custody form dated August 22, 2002, documenting transfer of samples or materials between DEP personnel.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155138
Documentation of sample chain of custody procedures for the 114 Liberty Street site.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000156050
Document tracking the chain of custody for environmental samples collected at 114 Liberty Street on August 22, 2002.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Buildings in this record
Machine-extracted building matches; verify each source. Buildings, never households.
- 114 Liberty Street · 2 pages · confidence 0.15 · verify page 1
- 125 Cedar Street · 1 pages · confidence 0.15 · verify page 7
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000154944
Summary table of chemical test results including lead and dioxin levels at 114 Liberty Street.
Filed in the same folder
NYC-WTC_000155020
Cover page for a Federal Emergency Management Agency transmission concerning the recovery efforts at 114 Liberty Street.
Filed in the same folder
Facsimile transmission of a permit application for 114 Liberty Street involving FEMA recovery efforts.
Filed in the same folder
NYC-WTC_000155100
Memo detailing asbestos air monitoring results, re-cleaning directives for specific floors, and damage assessment of the pizza shop ceiling.
Filed in the same folder
NYC-WTC_000155133
Letter explaining the scope of work for interior and HVAC cleaning developed with EPA review.
Filed in the same folder