Environmental lab report distribution, May 2002 — page 2
Summary EPA staff distributed an environmental laboratory report to federal and city agencies on May 15, 2002.
Asbestos Benzene Fibrous Glass PCBs Refractoiy Ceramic Fibers Chromium
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”. Semantic ranking is unavailable (ollama http 502); showing keyword-only results.
Summary EPA staff distributed an environmental laboratory report to federal and city agencies on May 15, 2002.
Asbestos Benzene Fibrous Glass PCBs Refractoiy Ceramic Fibers Chromium
EPA will analyze each of the samples collected for asbestos and lead.
Summary Cover sheet from the Council on Environmental Quality regarding sample handling and documentation in October 2003.
• Testing of collected samples for all contaminants of concern that have been found in WTC dust, such as asbestos, mercury, lead, dioxin, PCBs, PAH's, fiberglass,
Summary Draft document titled World Trade Center Emergency Safety and Health Plan dated September 30, 2001.
• When required by specific OSHA standards (e.g., asbestos, benzene, , lead, formaldehyde, Carbon Monoxide) • When worker exposure is reasonably anticipated to be
Summary Draft document titled World Trade Center Emergency Safety and Health Plan dated September 30, 2001.
If agency sampling (e.g., ambierit 'air or bulk sample) results from areas within or in close proximity to the work area exceed the prescribed “action level” for asbestos, the measures described
Summary DEP internal memo circulating draft EPA screening level standards for asbestos, fiberglass, and silica in indoor air and settled dust for agency comment.
NYC 9/11 Public Portal Document Contribuition to risk of various asbestos dust levels Risk = Conc(f/cc) * TWF * Slope factor TWF is weighting factor for partial exposure (less than
Asbestos Benzene Fibrous Glass PCBs Refractory Ceramic Fibers Chromium
Summary Fax cover sheet dated February 20, 2002, transmitting chain of custody records related to Pier 40 and West Street.
We will verbal results that state there is no asbestos in the air and the air quality is to make it available at. that time.
Summary US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
and disposed of in compliance with this Waste Management Plan and applicable regulations. 4.1 Contaminants Full-building asbestos
Summary EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
disposed of in compliance with this Waste Management Plan and applicable regulations. 4.1 Regulated Contaminants Full-building asbestos
Summary Forwarding of WTC background study documents including building access and sampling fact sheets to agency recipients.
EPA will analyze each of the samples collected for asbestos and lead.
Summary Distribution of revised scopes of work documents for WTC indoor cleaning and monitoring contracts.
In coordination with the EPA, the Project Monitor will access residential services requested from the Website and schedule clean-up activities and air sampling with the tenants/owners, asbestos
Summary Forwarding of WTC background study materials and building access fact sheets to DEP staff.
EPA will analyze each of the samples collected for asbestos and lead.
EPA will analyze each of the samples collected for asbestos and lead.
Summary EPA transmits revised scopes of work for WTC indoor cleaning and monitoring contracts to DEP.
In coordination with the EPA, the Project Monitor will access residential services requested from the Website and schedule clean-up activities and air sampling with the tenants/owners, asbestos
Summary EPA circulates WTC background study documents and sampling fact sheets to inter-agency partners.
Costs for the background study are being paid by the federal government EPA will analyze each of the samples collected for asbestos and lead.
Summary Internal DEP correspondence discussing EPA draft scope of work for WTC program and clarifying agency roles and responsibilities.
A minimum of one asbestos supervisor shall be present in each building during work. 6.
Summary EPA final scope of work documents for World Trade Center indoor dust cleaning and monitoring program forwarded to NYC project managers.
A minimum of one asbestos supervisor shall be present in each building during work.
Summary Administrative notice instructs staff to preserve original World Trade Center documents for potential litigation.
A minimum of one asbestos supervisor shall be present in each building during work. 6.
Summary DEP requests review of attached Scope of Work documents for mold remediation and air monitoring contracts.
A minimum of one asbestos supervisor shall be present in each building during work. 6.