NYC 9/11 Public Portal Document
Deliverables
All deliverables shall be provided via F2L or an agreed upon alternative electronic format approved by
USEPA and DEP.
The Project Monitor shall also maintain a copy ofeach deliverable and all filed documentation submitted
under this contract for 365 days.
The Project Monitor shall direct and coordinate all services and report all findings to EPA. The scope of
this project will be as follows: ,0^
1. The Project Monitor shall be responsible for accessing a secure EPA Website (url, user name and
password to be provided by EPA) to obtain requestor information (address, building identification
numbers, etc.). In coordination with the EPA, the Project Monitor will access residential services
requested from the Website and schedule clean-up activities and air sampling with the
tenants/owners, asbestos abatement contractors and air monitoring techmcians for the various
apartments. The Project Monitor will then supply relevant information on activities for the EPA
Indoor Air database via the secure EPA website. Data to be input may include but is not limited
to start and completion dates for the cleaning, sampling dates and sample identification numbers.
Deliverable
The Project Monitor shallReview all deliverables prior to submission to EPA. The review shall
assure that each deliverable is accurate and complete, technically sound, and free ofclerical errors.
The Project monitor shall provide a validated address and scheduling information into the EPA
Indoor Air web database via F2L or an agreed upon alternative electronic format or website
approved by EPA within 24 hours of activity.
2. TheProjectMonitorwillscheduleandconduct pre-cleaning or pre-sampling building inspections
ofthe residential units, heating,ventilation and air conditioning systems (HVAC) and common space
based on the information and requests from the residents and building owners. Residents will be
provided with information regarding sampling options (aggressive and modified aggressive sampling
protocols) and the handling ofvaluable personal items (money,jewelry, heirlooms, etc.) And fragile
objects during work. The Project Monitor will obtain written access and authorization to access
the building and clean the apartments, HVAC systems and common spaces using the EPA Access
Agreement (to be provided). The Project Monitor will advise EPA ifany offollowing conditions are
observed: mixed residential and commercial use within a building; dust and/or debris in common
spaces; the presence of mold that may pose a hazard to residents or workers (guidelines to be
NYC-WTC_000138635
OCR can misread numbers and units. Confirm readings against the page image before using them.