Asbestos inspection report, 102-104 Greenwich Street — page 43
Summary Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
Asbestos Certification ?
Email alerts are not offered yet — copy this link to check back after a new release.
Searching the mirrored records for “asbestos”.
Summary Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
Asbestos Certification ?
Director Asbestos Control Program NYC-WTC 000129136
Summary NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.
Clearance Testing: Aggressive area clearance testing for asbestos will be conducted for all work areas by TEM.
Summary Reply letter from PRC Management disputing a proposal for exterior cleaning of the 55 Fulton Street building only.
We are also in possession of testing of a particular terrace, which indicates the presence of asbestos; we can review this test result with your staff.
Summary Form documenting facade and roof inspections for visible debris at 140 Fulton Street following the WTC collapse.
The steps included the professional assessment of building contamination for possible hazardous components, including asbestos, and a retrospective filing, as required
Summary Chain of custody document tracking the collection and transport of bulk samples from 67 Greenwich Street for asbestos analysis.
Director Asbestos Control Program =CiSY DEAgi
Summary Inspection form documenting facade condition, ACM presence, and air monitoring status for the building.
Director oA, Asbestos Control Program (DEP- ee od NYC-WTC_000128389
Summary Department of Environmental Protection letter dated September 16, 2002, urging building owners to participate in the WTC debris cleaning program.
Asbestos Control Program DEP essncicae” NYC-WTC_000128470
Summary Final asbestos report conducted by Airtek Environmental Corp for the Greenwich Street Project LLC in May 2005.
Any materials that have not been tested and/or found positive for asbestos must be assumed ACM. 7.0 REPORT CERTIFICATIONS: Airtek certifies that the information contained herein is
Summary NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.
STORY) SS ACM FLASHING FOUND SPORADICALLY ALONG PERIMETER PEN THOUSE APPROXIMATELY 35 SF 9S VA EN (MAN) IVMZdIS 3LaYyONOO ST.PIPE @f| GRAPHIC SCALE y, 10 fe) 5 10 20 40 4 r 133-135 GREENWICH STREET NEW YORK, NY Brawing “Hat ASBESTOS
Summary Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
ASBESTOS ARA'f EM NT Co rott «{pfaa ePpi ° or twAding ownet may a nand ab ocher items 12.
Summary Document page displaying raw analytical data or charts related to asbestos testing for 92 Fulton Street.
Samples collected from various buildings indicated that some of the debris was asbestos-cor►uining material (ACM).
Summary Formal agreement between the City and a landowner regarding the removal of foreign material from building exteriors at 94 Greenwich Street.
Samples collected front various buildings indicated that some of the debris was asbestos-containing material (ACM).
Summary Asbestos inspection report for 96 Greenwich Street with a start date of November 4, 2002.
Director Asbestos Control Program CAN NORE CYT TAENEN T DEP SAMMONHENERL PRCTETON www.nyc.fox/dep 1718) DEP-HELP NYC-WTC_000128514
Summary Form for recording facade inspection results regarding WTC debris at 108 Greenwich Street.
Asbestos Control Program r ~ ww nc.Bovjde ti$; NYC-WTC 000128542
Summary Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
Notice for a final inspection shall be made by the owner or contractor to the asbestos safety control monitor. 9.
Summary Form requesting details on asbestos and air monitoring inspections at 110 Greenwich Street.
Director Asbestos Control Program CEECOR CT BRAPMUNO DEP TAMHONIEEL PEOETO www.nyc.goy/dep 17182 DEP-HELP NYC-WTC_000128603
Summary Response letter objecting to proposed exterior cleaning limited to one building, referencing a complex of nine residential buildings requiring assessment.
Director, Asbestos Control Program Department of Environmental 59-17 Junction Boulevard Flushing, NY 11373-5108 Re: 80 Gold Street, 55 Fulton Street/Foot Locker/Southbridge
Summary Administrative record identifier for the Phase 1 Decontamination Plan binder within DEP Box 52.
For detailed information on the asbestos survey conducted, please refer to the Airtek Asbestos Survey Report dated May 31, 2005 (Attached).
Summary Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.
Collecting personal air samples for both asbestos and other COPCs for HASP and OSHA compliance.