Final Asbestos Report, 21-23 Thames Street, May 2005

Machine-extracted title · confidence 100%

Final asbestos report conducted by Airtek Environmental Corp for the Greenwich Street Project LLC in May 2005.

NYC-WTC_000127695–000127728

Folder label: “BINDER - PHASE 1 DECONTAMINATION PLAN”

Page image
Scanned page image, NYC-WTC_000127700
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

6.0 AREAS NOT ACCESSIBLE: • Airtek inspected and sampled materials, which were observable and accessible to the survey team. Any materials that have not been tested and/or found positive for asbestos must be assumed ACM.

7.0 REPORT CERTIFICATIONS: Airtek certifies that the information contained herein is based on the physical and visual inspections conducted by Airtek and data collected during the inspection survey and file review.

Mo a All, Michael Porter, NYC Investigator Senior Project Manager

•

•

4

NYC-WTC 000127700

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000127700Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →