SECTION 02082
Regional Federal Environmental Protection Agency Office and must obtain the instructions
concerning proper disposal of asbestos waste materials.
B. All work required for the completion of this project or called for in this Specification must be
executed in a workmanlike manner by using the appropriate methods established by regulatory
requirements and/or industrial standards. All workmanship or work methods are subject to
review and acceptance by the Resident Engineer. Throughout the Specification, reference is
made to codes and standards, which establish qualities, levels or types of workmanship, which
will be considered acceptable. It is the Abatement Contractor’s responsibility to comply with
these codes and standards during the execution of this work.
C. All materials and equipment required or consumed during the work of this Contract must meet
the minimum acceptable criteria established by codes and standards referenced elsewhere in this
Specification. Materials and equipment must be submitted for prior approval as part of the
Contractor’s “Shop Drawings”.
D. Inspection: The Contractor shall conduct inspections of the work sites as often as the nature of
abatement work require. The cleanliness maintained at the worksites shall conform to the
requirements of the reference codes and that no visible emissions from worksites shall be
evident.
E. It is the Abatement Contractor’s responsibility, when so required by the Specification or upon
written request from the Commissioner or his representative to furnish all required proof that
workmanship, materials and/or equipment meet or exceed the codes and standards referenced.
Such proof shall be in the form requested, typically a certified report or test conducted by a
testing entity approved for that purpose by DDC.
F. The Contractor shall furnish proof that employees working under his supervision have had
instruction on the dangers of asbestos exposure, on respirator use, decontamination, and OSHA
regulations. This proof shall be in the form of a notarized affidavit to the effect that the above
requirements have been satisfied.
G. The Contractor will have at all times in his possession and in view at the job site the OSHA
regulations 29 CFR 1910.1001, and 1926.1101 Asbestos, and Environmental Protection Agency
40 CFR, Part 61, subpart B: National Emission Standard for asbestos, asbestos stripping, work
practices and disposal of asbestos waste. He shall also have one copy of NYC Title 15, Chapter
1 of RCNY and NYS DOL ICR 56 at the job site at all times.
H. Familiarity with Pertinent Codes and Standards: In procuring all items used in this work, it is the
Contractor's responsibility to verify the detailed requirements of the specifically named codes
and standards and to verify that the items procured for use in this work meet or exceed the
specified requirements, and are suitable for their intended use. In addition to the standards
described in this Section, the Contractor shall maintain that all his work complies with
requirements of pertinent governmental agencies having jurisdiction.
1. Storage, transport and disposal of contaminated waste shall be in accordance with all applicable
rules and regulations including NYC Local Law 70/85.