Health and Safety meeting memo, OEM, Oct 2001

Machine-extracted title · confidence 41%

Memo discussing a 1800 hour health and safety meeting attended by multiple agencies on 10/24/01.

NYC-WTC_000454470–000454471
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

New York State Department of Environmental Conservation 625 Broadway, 8*” Floor, Albany, NY 12233-2500 Phone: (518) 402-8821 • FAX: (518) 402-8830 Website: www.dec.state.ny.us CONSERVATION POLICE Erin M. Crotty Lawrence E. Johnson Commissioner Director

To: ECO Mark Spencer From: Peter Pettit & Nick Acampora Subject: Health and Safety 1800 hour meeting @ OEM

Date: 10/24/01

Staff attended the 1800 hour Health & Safety Meeting of Agencies including: DDC, OEM, NYCDOH, OSHA, USEPA, EDNYl Guai-d, Operating Engineers, FEMA and PESII. The following items were handed out at the meeting:

The Environmental Health Safety Task List Dated 10/24/01 4:58 PM OSHA Sampling Results Summary as of 10/23 U.S. Department of Labor WTC Recovery Project - Crane I’ask Force Rigging Inspection Report U.S. Environmental Protection Agency Air/Bulk/Wipe/Water Sampling Situation Report Tuesday, October 23, 2001 (3PM)

Copies of these attachments are available if needed.

Some of the specific discussions included the following:

• There was a lot of dust reported to be coming from the site today. The Dust Suppression proposal from ANGLE Aerial is expected shortly. They have been the dust suppression experts for AMEC and will be the overall site experts

• There were a number of flyovers by aircraft under the authority of DOE, NEMA and DOD to characterize the area and any emissions coming from the site. Results are expected to he provided as soon as possible but no specific time was indicated.

• The H&S Plan has not received final sign off but it is expected shortly. It was reported that the contractors now need to sign the document as well.

• Some of the steel being pulled from the pile is almost in a molten state which shows how hot the pile still remains. The The Department reported that the fire continues to burn and they continue to be frustrated with the fire within the pile. They will continue to do the best they can but the best way to get at the fire is to continue to pull it apart.

• They continue to have problems with the Gators onsite regarding their operations, speed and passenger loading.

• It was reported that the Bovis area was not using water for dust suppression today. It will be investigated tomorrow as to why.

1

CITY_21MC100_002795662

NYC-WTC_000454470

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000454470Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →