NYC-WTC_000250229
DOE/FM Global correspondence regarding reimbursement and settlement talks.
7 shared non-person entities · 1 shared topics · similarity 0.945
machine-extracted · confidence unavailable · Check page ↗DOH/ DOE correspondence about 89M dust cleanup and sampling procedures.
NYC-WTC_000453817–000453819OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
* scopes of work of change orders #1, #3, & #4, for $78,484.18 (invoice #183) (we have V & R's 12/5/01 "Proposal," but the descriptions of work are pretty terse, and the descriptions on the invoice even terser)
* Why this change order work was needed but not included in V & R's original "Proposal"
* Were the six (6) "Job Work Orders" that comprised change orders #5 (#3761, #3763, #3765, billed on invoice #7) and #6 (#3768, #3767, #3742, billed on invoice #16) part of the 9/11 recovery? Or just work done while the contractor was there? They are not always very legible; please provide a readable description of work for each
TDX's Response
This is in response to the e-mail notice I received from you regarding work at PS/IS 89 M. Hard copies of the requested information is being sent to you via currier. Change Order #1, 3 & 4 for $78, 484.18 (invoice #183) were not included in the original "proposal" because after the start date, on-going meetings and changes were made to satisfy UFT /PTA experts involved with the SCA to develop working protocols that were agreeable.
The six (6) "Job Work Orders" that comprised change orders #5(#3761,#3763,#3765, billed on invoice # 7) and #6 (#3768,#3767, #3742, billed on invoice #16) was for work that needed to be performed in order to run the equipment for testing and completion
KISS * Please provide explanation of scope and need for carpet testing in the summer of '02
Section 1.0 Introduction Taylor Environmental Group, Inc. ("TEG") was retained by Mr. Srinivas Kanaparthi of the New York City School Construction Authority ("SCA") on August 30, 2002, to perform environmental consultant services at Public School 89M, located at 201 Warren Street, New York, NY. The consultant services were to be performed in conjunction with work outlined in SCA Monitor Proceed Order #M089-15344, LLW#028804. A copy of this request letter is appendixed to this Report. The requested services included the following: 1. Project monitoring and project management during the performance of the test tent procedures at the facility 2. Collection and analysis of airborne asbestos samples (TEM) Section 2.0 Project Summary The carpet test-tent procedure as outlined below was formulated by the NYC BOE in order to evaluate any airborne asbestos fiber release resulting from vacuuming carpets utilizing commercial vacuum cleaners (without HEPA Filters). Taylor Environmental Group, Inc. ("TEG") and Kiss Construction, Inc. ("KCI") were requested to perform test tent procedures in the following locations within the facility: 1. Sth Floor Library 2. Room 208B TEG and KOT followed the following NYC BOE / NYC SCA approved procedure: 1. KCI to pre-clean carpet using HEPA Vacuum. 2. KCI to construct a tent (6-mil poly and 2''x3'' studs) with an attached air-lock, leaving the carpet exposed. 3. TEG to set-up five (5) air samples (to be analyzed via TEM) within the tent, in addition to one (1) 20'' box fan. 4. KCI personnel to use a brand-new commercial vacuum cleaner (without a HEPA filter) to vacuum the exposed carpet within the tent a minimum of two (2) times, whilst the air samples are being collected.
CITY_21MC100_009367911
NYC-WTC_000453818
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000250229
DOE/FM Global correspondence regarding reimbursement and settlement talks.
7 shared non-person entities · 1 shared topics · similarity 0.945
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000250232
Follow-up DOE/FM Global invoice communications for PS/IS89 cleanup claims.
7 shared non-person entities · 1 shared topics · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000147982
A project proposal outlining the timeline, methods, and justification for cleaning HVAC systems in residential units affected by World Trade Center dust.
5 shared non-person entities · 1 shared topics · similarity 0.946
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000140959
Form authorizing the City of New York to proceed with obligations related to FEMA emergency management programs for WTC cleanup.
4 shared non-person entities · 1 shared topics · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138918
Internal DEP correspondence discussing EPA draft scope of work for WTC program and clarifying agency roles and responsibilities.
4 shared non-person entities · 1 shared topics · similarity 0.943
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138626
Distribution of revised scopes of work documents for WTC indoor cleaning and monitoring contracts.
5 shared non-person entities · 1 shared topics · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000161325
Final scope of work documents for indoor dust cleaning and monitoring contractor activities in WTC cleanup program.
5 shared non-person entities · 1 shared topics · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139209
Administrative notice instructs staff to preserve original World Trade Center documents for potential litigation.
4 shared non-person entities · 1 shared topics · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138992
Forwarding of WTC cleanup program fact sheets concerning cleaning, HVAC, and related remediation activities to project staff.
5 shared non-person entities · 1 shared topics · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139232
DEP requests review of attached Scope of Work documents for mold remediation and air monitoring contracts.
4 shared non-person entities · 1 shared topics · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000161691
Notice for a mandatory pre-bid meeting regarding World Trade Center dust cleaning contracts and regulatory compliance requirements.
4 shared non-person entities · 1 shared topics · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163947
EPA distribution of inter-agency coordination matrix to federal, state, and local agencies regarding post-9/11 environmental response.
5 shared non-person entities · 1 shared topics · similarity 0.942
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000437075
TEG carpet cleaning procedure with TEM air-monitoring results inside tents.
Similarity score 0.939 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000186022
Memo summarizing air monitoring results for asbestos during controlled carpet cleaning procedures at a facility on August 20, 2002.
Similarity score 0.938 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139069
EPA scope of work documents for World Trade Center indoor dust cleaning program monitoring and remediation procedures.
Similarity score 0.937 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429996
Summary memo detailing project team and partner firms for Stuyvesant High School work, Aug 2002.
Similarity score 0.937 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000246082
Internal memos outlining asbestos sampling protocols for auditorium and office areas.
Similarity score 0.937 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139005
EPA final scope of work documents for monitoring and cleaning operations in World Trade Center indoor dust remediation program.
Similarity score 0.936 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000147982
A project proposal outlining the timeline, methods, and justification for cleaning HVAC systems in residential units affected by World Trade Center dust.
Similar indexed content
NYC-WTC_000250229
DOE/FM Global correspondence regarding reimbursement and settlement talks.
Similar indexed content
NYC-WTC_000140959
Form authorizing the City of New York to proceed with obligations related to FEMA emergency management programs for WTC cleanup.
Similar indexed content
NYC-WTC_000138918
Internal DEP correspondence discussing EPA draft scope of work for WTC program and clarifying agency roles and responsibilities.
Similar indexed content
NYC-WTC_000250232
Follow-up DOE/FM Global invoice communications for PS/IS89 cleanup claims.
Similar indexed content