Quality Assurance Plan, Environmental Monitoring

Machine-extracted title · confidence 50%

QA plan for environmental air monitoring and waste management at NYC sites.

NYC-WTC_000451195–000451304
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part V - Quality Assurance Project Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 - September 29, 2005

Table 7-2. Phase I: Preparation Phase & Asbestos and COPC Abatement and Removal Sampling and Analy sis Summary Location Parameter(s) Sample Frequency Analysis Method

Site Area Mercury (vapor/gas) Each Day Lumex, portable mercury analyzer Site Area Visible dust emissions Each Day Visual observation ScalfoldingSlrcet 1. Asbestos Each Day (asbestos and silica 1. TEM/SEM Level/School Auditorium 2. Silica are sampled during work shift 2. XRD Roof (3 Locations) 3. Metals Each Day (24 hr. Basis) 3. ICP/MS 4. PCDDs/PCDFs 4. HRGC/HRMS 5. PAHs 5. GC/MS 6. PCBs 6. GC/ECD 7. Mercury' (total) 7. lodatedCarbon Trap/eVAFS 8. PMio Continuously “Real-Time” Each 8. EBAM/Gravimetric 9. PM2.5 Day (PMio and PM2.5 on 24 hour 9. EBAM/Gravimetric basis at each location; PMio and PM2.5 reference sampler at 1 location per day on 24- hour basis with location changed monthly)

Table 7-3. Phase II - Structural Deconstruction Phase Sampling and Analysis Summary Location Paramctcr(s) Sample Frequency Analysis Method

Site Area Mercury (vapor/gas) Each Day Lumex, portable mercury analyzer Site Area Visible dust emissions Each Day Visual observation ScalfoldingSlrcet 1. Asbestos Each Day (asbestos and silica 1. TEM/SEM Level/School Auditorium 2. Silica are sampled during work shift 2. XRD Roof (3 Locations) 3. Metals Each Day (24 hr. Basis) 3. ICP/MS 4. PCDDs/PCDFs 4. HRGC/HRMS 5. PAHs 5. GC/MS 6. PCBs 6. GC/ECD 7. Mercury' (total) 7. lodatedCarbon Trap/eVAFS 8. PMio Continuously “Real-Time” Each 8. EBAM/Gravimetric 9. PM2.5 Day (PMio and PM2.5 on 24 hour 9. EBAM/Gravimetric basis at each location; PMio and PM2.5 reference sampler at 1 location per day on 24- hour basis with location changed monthly)

31

CITY_21MC100_003221684

NYC-WTC_000451225

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000451225Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000423885

Quality Assurance Project Plan for environmental air monitoring and waste management at Greenwich and Thames sites; Sept 30, 2005.

Similar indexed content

NYC-WTC_000440780

Plan document for environmental air monitoring at Greenwich Street and Thames Street sites, dated November 4, 2005.

Similar indexed content

NYC-WTC_000447434

Chain of custody plan for Greenwich Street/Thames Street site air monitoring.

Similar indexed content

Compare copies and versions →