Plan for Environmental Community Air Monitoring, Greenwich/Thames

Machine-extracted title · confidence 45%

Plan document for environmental air monitoring at Greenwich Street and Thames Street sites, dated November 4, 2005.

NYC-WTC_000440780–000440908
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part V - Quality Assurance Project Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 - November 4, 2005

Table 7-2. Abatement Phase: Asbestos and COPC Abatement and Removal Sampling and Analysis Summary Location Parameter(s) Sample Frequency Analysis Method

Site Area Mercury (vapor/gas) Each Day Lumex, portable mercury analyzer Site Area Visible dust emissions Each Day Visual observation ScalfoldingSlrcct 1. Asbestos Each Day (asbestos and silica 1. TEM/SEM Level/School Auditorium 2. Silica are sampled during work shift 2. XRD Roof (3 Locations) 3. Metals Each Day (24 hr. Basis) 3. ICP/MS 4. PCDDs/PCDFs 4. HRGC/HRMS 5. PAHs 5. GC/MS 6. PCBs 6. GC/ECD 7. Mercury' (total) 7. lodatedCarbon Trap/CVAFS 8. PMio Continuously “Real-Time” Each 8. EBAM/Gravimetric 9. PM2.5 Day (PMio and PM2.5 on 24 hour 9. EBAM/Gravimetric basis at each location; PMio and PM2.5 reference sampler at 1 location per day on 24- hour basis with location changed bi­ weekly)

Table 7-3. Demolition Phase - Structural Deconstruction Phase Sampling and Analysis Summary Location Parameter(s) Sample Frequency Analysis Method

Site Area Mercury (vapor/gas) Each Day Lumex, portable mercury analyzer Site Area Visible dust emissions Each Day Visual observation Scaffolding'Street 1. Asbestos Each Day (asbestos and silica 1. TEM/SEM Level/School Auditorium 2. Silica are sampled during work shift 2. XRD Roof (3 Locations) 3. Metals Each Day (24 hr. Basis) 3. ICP/MS 4. PCDDs/PCDFs 4. HRGC/HRMS 5. PAHs 5. GC/MS 6. PCBs 6. GC/ECD 7. Mercury' (total) 7. lodatedCarbon Trap/CVAFS 8. PMio Continuously “Real-Time” Each 8. EBAM/Gravimetric 9. PM2.5 Day (PMio and PM2.5 on 24 hour 9. EBAM/Gravimetric basis at each location; PMio and PM2.5 reference sampler at 1 location per day on 24- hour basis with location changed bi­ weekly)

29

CITY_21MC100_0 03220169

NYC-WTC_000440808

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000440808Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000447434

Chain of custody plan for Greenwich Street/Thames Street site air monitoring.

Similar indexed content

NYC-WTC_000444945

Plan and submittals for environmental community air monitoring at 133-135 Greenwich and 21-23 Thames.

Similar indexed content

NYC-WTC_000441316

Plan for Environmental Community Air Monitoring at Greenwich Street and Thames Street sites, Nov 2005.

Similar indexed content

Compare copies and versions →