Part V - Quality Assurance Project Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701 - September 29, 2005
Phase II - Structural Deconstruction During Phase II of the deconstruction project, air
monitoring will take place at twelve (12) stations each day. During the first three (3) days
only of Phase II, samples will be collected and analyzed for semivolatile organics to
include PCDDs/PCDFs, PAHs and PCBs. After this first three (3) day period, sampling
for semivolatile organics will be reduced to a once per week frequency employing the
entire station network. One day per week on a rotating basis (week #1 Monday, week #2
Tuesday, etc.) samples will be collected at every station in the network. The schedule will
be repeated until project completion. The semivolatile organic samples collected
employing this weekly sampling frequency will not be processed for analyses; rather they
will be placed in archival storage at the laboratory. A single set of samples will be
selected from each weekly sampling event to undergo analyses for PCDDs/PCDFs, PAHs
and PCBs. This sample set will be selected after consideration of the PMio data
corresponding to the sites and days where organic samples were collected. The
station with the highest 24-hour average PMio concentration (ug mi) recorded with a
collocated organic sample each week will be selected for analyses. Monitoring will cease
at project completion pursuant to completion of deconstruction plan activities.
7.1.2 Analytical Tasks
These objectives include monitoring of dust potentially related to the deconstruction for
the presence of contaminants related to the WTC terrorist attacks that might pose long
term health risks to local residents.as well as identifying levels of Contaminants of
Potential Concern (COPCs) associated with the materials at 133-135 Greenwich Street
and 21-23 Thames Street. In this manner the deconstruction project can proceed while
providing an ample margin of safety for human health and the environment in the vicinity
of the project site. The following target parameters were selected for inclusion in
the monitoring program based upon criteria established by USEPA and the Contaminants
of Potential Concern (COPC Committee):
• PMio-Rcspirablc Particulate
• PM2.5-Respirable Particulate
• Asbestos
• Crystalline Silica
• PCDDs/PCDFs
• PAHs
• PCBs
• Metals (antimony, barium, beryllium, cadmium, chromium, copper, lead, mercury
[gaseous and total] manganese, nickel and zinc).
The analyses of asbestos, crystalline silica, PCDDs/PCDFs, PAHs, PCBs, metals,
particulate bound mercury, PMio 24-hour reference samples, and PM2.5 24-hour reference
samples will be performed by fixed laboratories. Field analyses during this investigation
will include PMio- Respirable Particulate, PM2.5-Respirable Particulate, and gaseous
mercury. The data produced from all analyses will be evaluated and used.