Part V - Quality Assurance Project Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701 - Rev 1 - February 1, 2006
PMio and PM2.5 Using a TEOM 1400a Continuous Monitor
Maintenance, testing, and inspection requirements for the TEOM 1400a continuous
monitors are as follows.
• Audit flow system at each bi-weekly rotation by performing leak checks and flow
audits.
• Clean inlets once a month.
• Service pump annually or more often as needed.
• Check the measurement system with the Zero and Span plates quarterly.
• Clean dust off of detector-sensing region quarterly during calibration audit.
PMio and PM2.5 Using a Met One E-BAM Continuous Monitor
Maintenance, testing, and inspection requirements for the E-BAM continuous monitors
are as follows.
• Audit flow system monthly by performing leak checks and flow audits.
• Clean inlets once a month.
• Service pump annually or more often as needed.
• Check the measurement system with the Zero and Span plates quarterly.
• Clean dust off of detector-sensing region quarterly during calibration audit.
13.1.2 Analytical Laboratory Equipment
This section describes the procedures and documentation activities that will be performed
to ensure that all fixed laboratory instrumentation and equipment are available and in
good working order when needed. Table 13-2 details the fixed laboratory instrument
maintenance, testing, and inspection requirements. Equipment maintenance logs must be
kept and equipment must be checked prior to use.
Table 13-2. Instrument Maintenance, Testing and Inspection Requirements for Fixed Laboratory
Analyses_______________________________________
Parameter/Instrument Maintenance, Testing and Inspection Activities
Metals/ICP/MS Clean nebulizer, check pump tubing, replace disposables,
check torch alignment, clean spray chamber.
Inspect waste and rinse water container levels.
Inspect roughing pump oil level and color.
Remove and wipe down interface cones (replace as
necessary).
Inspect the injector and support adapter for cleanliness.
Check the peristaltic pump tubing for wear- and replace as
necessary.