NYC-WTC_000437816
Plan document for Environmental Community Air Monitoring at Greenwich and Thames sites, Nov 4, 2005.
95 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗Plan documents for environmental community air monitoring at Greenwich/Thames street sites, Nov 2005.
NYC-WTC_000444496–000444629OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Part V - Quality Assurance Project Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 - November 4, 2005
PMio and PM2.5 Using a TEOM 1400a Continuous Monitor
Maintenance, testing, and inspection requirements for the TEOM 1400a continuous monitors are as follows.
• Audit flow system periodically by performing leak checks and flow audits. • Clean inlets once a month. • Service pump annually or more often as needed. • Check the measurement system with the Zero and Span plates quarterly. • Clean dust off of detector-sensing region quarterly during calibration audit.
PMio and PM2.5 Using a Met One E-BAM Continuous Monitor
Maintenance, testing, and inspection requirements for the E-BAM continuous monitors are as follows.
• Audit flow system periodically by performing leak checks and flow audits. • Clean inlets once a month. • Service pump annually or more often as needed. • Check the measurement system with the Zero and Span plates quarterly. • Clean dust off of detector-sensing region quarterly during calibration audit.
13.1.2 Analytical Laboratory Equipment
This section describes the procedures and documentation activities that will be performed to ensure that all fixed laboratory instrumentation and equipment are available and in good working order when needed. Table 13-2 details the fixed laboratory instrument maintenance, testing, and inspection requirements. Equipment maintenance logs must be kept and equipment must be checked prior to use.______________________________________________ Table 13-2. Instrument Maintenance, Testing and Inspection Requirements for Fixed Laboratory Analyses_______________________________________ Parameter/Instrument Maintenance, Testing and Inspection Activities Metals/ICP/MS Clean nebulizer, check pump tubing, replace disposables, check torch alignment, clean spray chamber. Inspect waste and rinse water container levels. Inspect roughing pump oil level and color. Remove and wipe down interface cones (replace as necessary). Inspect the injector and support adapter for cleanliness. Check the peristaltic pump tubing for wear and replace as necessary.
92
CITY_21MC100_007120810
NYC-WTC_000444587
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000437816
Plan document for Environmental Community Air Monitoring at Greenwich and Thames sites, Nov 4, 2005.
95 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441133
Plan for Environmental Community Air Monitoring at Greenwich/Thames sites, Nov 2005.
95 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441316
Plan for Environmental Community Air Monitoring at Greenwich Street and Thames Street sites, Nov 2005.
93 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000453085
Plan for Greenwich Street and Thames Street monitoring within WTC-related cleanup.
93 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000446622
Part V plan for Environmental Community Air Monitoring at Greenwich/Thames sites.
91 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000446145
Chain-of-custody form for Environmental Community Air Monitoring Program samples at Greenwich/Thames sites.
91 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000448085
Title/approval sheet for Environmental Community Air Monitoring Program and Greenwich/Thames Plan.
91 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000447434
Chain of custody plan for Greenwich Street/Thames Street site air monitoring.
90 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000440780
Plan document for environmental air monitoring at Greenwich Street and Thames Street sites, dated November 4, 2005.
90 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000444945
Plan and submittals for environmental community air monitoring at 133-135 Greenwich and 21-23 Thames.
90 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000443742
Chain-of-custody form for Environmental Community Air Monitoring Program plans at Greenwich Street and Thames Street, dated November 4, 2005.
90 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000426348
Plan document outlining community air monitoring for Greenwich and Thames sites.
91 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000437816
Plan document for Environmental Community Air Monitoring at Greenwich and Thames sites, Nov 4, 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441133
Plan for Environmental Community Air Monitoring at Greenwich/Thames sites, Nov 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441316
Plan for Environmental Community Air Monitoring at Greenwich Street and Thames Street sites, Nov 2005.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000453085
Plan for Greenwich Street and Thames Street monitoring within WTC-related cleanup.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000442410
Plan for Environmental Community Air Monitoring at Greenwich Street and Thames Street sites.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000427716
CoC document for Greenwich/Thames Street air monitoring plan dated Nov 9, 2005.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000437816
Plan document for Environmental Community Air Monitoring at Greenwich and Thames sites, Nov 4, 2005.
Similar indexed content
Plan for Environmental Community Air Monitoring at Greenwich/Thames sites, Nov 2005.
Similar indexed content
Plan for Environmental Community Air Monitoring at Greenwich Street and Thames Street sites, Nov 2005.
Similar indexed content
Plan for Greenwich Street and Thames Street monitoring within WTC-related cleanup.
Similar indexed content
Part V plan for Environmental Community Air Monitoring at Greenwich/Thames sites.
Similar indexed content