NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 134 pages

Greenwich/Thames plan: Environmental monitoring

Machine-extracted title · confidence 32%

Plan for Environmental Community Air Monitoring at Greenwich Street and Thames Street sites.

NYC-WTC_000442410–000442543
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Part V - Quality Assurance Project Plan 133-135 Greenwich Street/21-23 Thames Street Airtek Project 05-0701 - November 9, 2005

PMio and PM2.5 Using a TEOM 1400a Continuous Monitor

Maintenance, testing, and inspection requirements for the TEOM 1400a continuous monitors are as follows.

• Audit flow system periodically by performing leak checks and flow audits. • Clean inlets once a month. • Service pump annually or more often as needed. • Check the measurement system with the Zero and Span plates quarterly. • Clean dust off of detector-sensing region quarterly during calibration audit.

PMio and PM2.5 Using a Met One E-BAM Continuous Monitor

Maintenance, testing, and inspection requirements for the E-BAM continuous monitors are as follows.

• Audit flow system periodically by performing leak checks and flow audits. • Clean inlets once a month. • Service pump annually or more often as needed. • Check the measurement system with the Zero and Span plates quarterly. • Clean dust off of detector-sensing region quarterly during calibration audit.

13.1.2 Analytical Laboratory Equipment

This section describes the procedures and documentation activities that will be performed to ensure that all fixed laboratory instrumentation and equipment are available and in good working order when needed. Table 13-2 details the fixed laboratory instrument maintenance, testing, and inspection requirements. Equipment maintenance logs must be kept and equipment must be checked prior to use._____________________________________________ Table 13-2, Instrument Maintenance, Testing and Inspection Requirements for Fixed Laboratory Analyses______________________________________ Parameter/Instrument Maintenance, Testing and Inspection Activities Metals/ICP/MS Clean nebulizer, check pump tubing, replace disposables, check torch alignment, clean spray chamber. Inspect waste and rinse water container levels. Inspect roughing pump oil level and color. Remove and wipe down interface cones (replace as necessary). Inspect the injector and support adapter for cleanliness. Check the peristaltic pump tubing for wear and replace as necessary.

92

CONFIDENTIAL, CITY_21MC100_007849868 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000442501

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000442501Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000451808

Plan for Greenwich Street and Thames Street air monitoring project, Nov 9, 2005.

Similar indexed content

NYC-WTC_000441316

Plan for Environmental Community Air Monitoring at Greenwich Street and Thames Street sites, Nov 2005.

Similar indexed content

NYC-WTC_000420513

Plan for environmental air monitoring around The Greenwich Street and Thames Street sites.

Similar indexed content

NYC-WTC_000444496

Plan documents for environmental community air monitoring at Greenwich/Thames street sites, Nov 2005.

Similar indexed content

Compare copies and versions →