NYC 9/11 Public Portal Document
Part V - Quality Assurance Project Plan
133-135 Greenwich Street/21-23 Thames Street
Airtek Project 05-0701 - Rev 1 - February 1, 2006
Asbestos, Mercury, and PCBs using a Personal Sampling Pump
Maintenance, testing and inspection requirements for the personal sampling pumps are
as follows:
• Routine maintenance will be performed according to the manufacturer’s
instnictions on the following schedule:
Part Replacement Interval (hours)
Valves 2,000
Pump Diaphragm 2,500
Dampener 2,500
Motor 4,500
Note: Replacement intervals may be shorter in dusty conditions.
• Flow Rate Verification - On a weekly basis, the field technician will verify the
sampling flow rate on the sampling pump using a rotometer, bubble meter, or
other suitable flow measuring device that is NIST traceable. The flow rate should
not vary from the set point by more than ±10%. If it does, the flow through the
pump must be recalibrated.
Respirable Silica using a Personal Sampling Pump Maintenance, testing, and
inspection requirements for the personal sampling pump are as follows:
• Routine maintenance of pump will be performed according to the manufacturer’s
instructions on the following schedule:
Part Replacement Interval (hours)
Valves 2,000
Pump Diaphragm 2,500
Dampner 2,500
Motor 4,500
Note: Replacement intervals may be shorter in dusty conditions.
• Flow Rate Verification - On a weekly basis, the field technician will verify the
sampling flow rate on the sampling pump using a rotometer, bubble meter, or
other suitable flow measuring device that is NIST traceable. The flow rate should
not vary from the set point by more than ±10%. If it does, the flow through the
pump must be recalibrated.